Nenana RivGen Project
Summary
Project Name: Nenana RivGen Project
FERC Project Number: P-13883
Water Body: Nenana
Region: IN
Type of Project: Hydrokinetic-River
Status: Preliminary Permit
Details
Operating Utility or Developer: ORPC Alaska, LLC
Preliminary Permit Exp Date: 3-12-2013
Nameplate Power Capacity (MW) : 0.3
Annual Estimate Generation (GWH) : 0.7
Surface Area of Impoundment (acres): 0
Project Details: Six 50 KW Rivgen turbines which will be placed in the river. It would run 140 days a year.