2023 USGS Lidar: Southwest Central Alabama
OCM Partners
Data Set
(DS)
| ID: 72983
| Published / External
Created: 2024-06-21
|
Last Modified: 2024-06-21
Project (PRJ) | ID: 49401
ID: 72983
Data Set (DS)
* Discovery• First Pass
» Metadata Rubric
Item Identification
* » Title | 2023 USGS Lidar: Southwest Central Alabama |
---|---|
Short Name | al2023_sw_cent_m10144_metadata |
* Status | Completed |
Creation Date | 2023 |
Revision Date | |
• Publication Date | 2024 |
* » Abstract |
The Project data set consists of the Classified Point Cloud. The Geographical Extent of this dataset extends to the entirety of the AL_SWCentral_B22 UTM Zone 16N boundary, approximately 4685 square miles in the following counties: Choctaw, Mobile, Tuscaloosa, Washington Ground Conditions: water at normal levels; no unusual inundation; no snow; leaf off. How the Withheld Points are Identified: Withheld (ignore) points were identified in the files using the standard LAS Withheld bit. This metadata record supports the data entry in the NOAA Digital Coast Data Access Viewer (DAV). For this data set, the DAV is leveraging the Entwine Point Tiles (EPT) hosted by USGS on Amazon Web Services. |
* Purpose |
The USGS and NRCS contracted Digital Aerial Solutions, LLC to obtain professional services related to the planning, acquisition and development of Light Detection and Ranging (Lidar) data and derivative products.The task order is for a QL2 LiDAR survey to be collected over Choctaw, Mobile, Tuscaloosa and Washington counties in the state of Alabama. The deliverable products would be used by USGS and NRCS for conservation planning, design, research, floodplain mapping, wetlands identification, dam safety assessments, hydrologic modeling, and other environmental purposes. |
Notes | |
Other Citation Details | |
• Supplemental Information |
All Lidar data and associated products were acquired, calibrated, and used in the creation of Lidar derived products by Digital Aerial Solutions, LLC. ANPS: 0.32 Meters Tile Size: 1,500 Meters Spec: National GeospatALl Program(NGP) Lidar Base Specification 2022 rev. A LAS File Type: 1.4 type 6 The following are the USGS lidar fields in JSON: {
"ldrinfo" : {
"ldrspec" : "U.S. Geological Survey (USGS) - National Geospatial Program(NGP) Lidar Base Specification 2022 rev. A", "ldrsens" : "Leica Terrain Mapper SN# 90524", "ldrmaxnr" : "15", "ldrnps" : "0.32", "ldrdens" : "3.20", "ldranps" : "0.32", "ldradens" : "3.20", "ldrfltht" : "2000", "ldrfltsp" : "155", "ldrscana" : "40.0", "ldrscanr" : "150.0", "ldrpulsr" : "650.0", "ldrpulsd" : "3", "ldrpulsw" : "0.55", "ldrwavel" : "1064", "ldrmpia" : "0", "ldrbmdiv" : "0.15", "ldrswatw" : "1674.26", "ldrswato" : "30", "ldrgeoid" : "National Geodetic Survey (NGS) Geoid 18" }, "ldraccur" : {
"ldrchacc" : "0", "rawnva" : "0", "rawnvan" : "0", "clsnva" : "0", "clsnvan" : "0", "clsvva" : "0", "clsvvan" : "0" }, "lasinfo" : {
"lasver" : "1.4", "lasprf" : "6", "laswheld" : "Withheld (ignore) points were identified in the files using the standard LAS Withheld bit.", "lasolap" : "Swath âoverageâ points were not identified in these files using the standard LAS overlap bit.", "lasintr" : "16", "lasclass" : {
"clascode" : "1", "clasitem" : "Undetermined/Unclassified" }, "lasclass" : {
"clascode" : "2", "clasitem" : "Bare earth" }, "lasclass" : {
"clascode" : "7", "clasitem" : "Low Noise" }, "lasclass" : {
"clascode" : "9", "clasitem" : "Water" }, "lasclass" : {
"clascode" : "17", "clasitem" : "Bridges" }, "lasclass" : {
"clascode" : "18", "clasitem" : "High Noise" }, "lasclass" : {
"clascode" : "20", "clasitem" : "Ignored Ground" }, "lasclass" : {
"clascode" : "22", "clasitem" : "Temporal Exclusion" } }} |
DOI (Digital Object Identifier) | |
DOI Registration Authority | |
DOI Issue Date |
Keywords
Theme Keywords
Thesaurus | Keyword |
---|---|
Global Change Master Directory (GCMD) Science Keywords | EARTH SCIENCE > LAND SURFACE > TOPOGRAPHY > TERRAIN ELEVATION |
Global Change Master Directory (GCMD) Science Keywords | EARTH SCIENCE > OCEANS > COASTAL PROCESSES > COASTAL ELEVATION |
ISO 19115 Topic Category | elevation |
Temporal Keywords
Thesaurus | Keyword |
---|---|
* Spatial Keywords
Thesaurus | Keyword |
---|---|
Global Change Master Directory (GCMD) Location Keywords | CONTINENT > NORTH AMERICA > UNITED STATES OF AMERICA |
Global Change Master Directory (GCMD) Location Keywords | CONTINENT > NORTH AMERICA > UNITED STATES OF AMERICA > ALABAMA |
Global Change Master Directory (GCMD) Location Keywords | VERTICAL LOCATION > LAND SURFACE |
Stratum Keywords
Thesaurus | Keyword |
---|---|
Instrument Keywords
Thesaurus | Keyword |
---|---|
Global Change Master Directory (GCMD) Instrument Keywords | LIDAR > Light Detection and Ranging |
Platform Keywords
Thesaurus | Keyword |
---|---|
Global Change Master Directory (GCMD) Platform Keywords | Airplane > Airplane |
Physical Location
• » Organization | Office for Coastal Management |
---|---|
• » City | Charleston |
• » State/Province | SC |
• Country | |
• » Location Description |
Data Set Information
* Data Set Scope Code | Data Set |
---|---|
• Data Set Type | Elevation |
• Maintenance Frequency | As Needed |
Maintenance Note | |
» Data Presentation Form | Model (digital) |
• Entity Attribute Overview | |
Entity Attribute Detail Citation |
None |
Entity Attribute Detail URL | |
Distribution Liability |
None. Any conclusions drawn from the analysis of this information are not the responsibility of NOAA, the Office for Coastal Management or its partners. |
Data Set Credit | Digital Aerial Solutions, LLC, USGS, NRCS |
Support Roles
* » Support Role | Data Steward |
---|---|
* » Date Effective From | 2024 |
Date Effective To | |
Organization | NOAA Office for Coastal Management (NOAA/OCM) |
Address |
2234 South Hobson Ave Charleston, SC 29405-2413 |
Email Address | coastal.info@noaa.gov |
Phone | (843) 740-1202 |
Fax | |
Mobile | |
URL | https://coast.noaa.gov |
Business Hours | |
Contact Instructions |
* » Support Role | Distributor |
---|---|
* » Date Effective From | 2024 |
Date Effective To | |
Organization | NOAA Office for Coastal Management (NOAA/OCM) |
Address |
2234 South Hobson Ave Charleston, SC 29405-2413 |
Email Address | coastal.info@noaa.gov |
Phone | (843) 740-1202 |
Fax | |
Mobile | |
URL | https://coast.noaa.gov |
Business Hours | |
Contact Instructions |
* » Support Role | Distributor |
---|---|
* » Date Effective From | 2024 |
Date Effective To | |
Organization | U.S. Geological Survey |
Address |
12201 Sunrise Valley Drive Reston, VA 20191 USA |
Email Address | |
Phone | |
Fax | |
Mobile | |
URL | https://usgs.gov |
Business Hours | |
Contact Instructions |
* » Support Role | Metadata Contact |
---|---|
* » Date Effective From | 2024 |
Date Effective To | |
Organization | NOAA Office for Coastal Management (NOAA/OCM) |
Address |
2234 South Hobson Ave Charleston, SC 29405-2413 |
Email Address | coastal.info@noaa.gov |
Phone | (843) 740-1202 |
Fax | |
Mobile | |
URL | https://coast.noaa.gov |
Business Hours | |
Contact Instructions |
* » Support Role | Point of Contact |
---|---|
* » Date Effective From | 2024 |
Date Effective To | |
Organization | NOAA Office for Coastal Management (NOAA/OCM) |
Address |
2234 South Hobson Ave Charleston, SC 29405-2413 |
Email Address | coastal.info@noaa.gov |
Phone | (843) 740-1202 |
Fax | |
Mobile | |
URL | https://coast.noaa.gov |
Business Hours | |
Contact Instructions |
* » Support Role | |
---|---|
* » Date Effective From | |
Date Effective To | |
* » Contact | |
* Contact Instructions |
* » Support Role | |
---|---|
* » Date Effective From | |
Date Effective To | |
* » Contact | |
* Contact Instructions |
* » Support Role | |
---|---|
* » Date Effective From | |
Date Effective To | |
* » Contact | |
* Contact Instructions |
Extents
Currentness Reference | Ground Condition |
---|
Extent Group 1
Extent Description |
---|
Extent Group 1 / Geographic Area 1
* » W° Bound | -88.50272 |
---|---|
* » E° Bound | -87.067547 |
* » N° Bound | 33.612328 |
* » S° Bound | 30.217729 |
* » Description |
Extent Group 1 / Vertical Extent
EPSG Code | |
---|---|
Vertical Minimum | |
Vertical Maximum |
Extent Group 1 / Time Frame 1
* » Time Frame Type | Range |
---|---|
* » Start | 2023-01-09 |
End | 2023-03-05 |
Alternate Start As Of Info | |
Alternate End As Of Info | |
Description |
Spatial Information
Spatial Resolution
Angular Distance | |
---|---|
Angular Distance Units | |
Horizontal Distance | |
Horizontal Distance Units | |
Vertical Distance | |
Vertical Distance Units | |
Equivalent Scale Denominator | |
Level of Detail Description |
Spatial Representation
Grid Representation Used? | No |
---|---|
Vector Representation Used? | Yes |
Text / Table Representation Used? | No |
TIN Representation Used? | No |
Stereo Model Representation Used? | No |
Video Representation Used? | No |
Grid Representation
Dimension Count | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Cell Geometry | |||||||||||||
Transformation Parameter Available? | |||||||||||||
Axis Dimension |
|||||||||||||
|
|||||||||||||
Axis Dimension |
|||||||||||||
|
Vector Representation
Topology Level | |
---|---|
Complex Object Present? | |
Complex Object Count | |
Composite Object Present? | |
Composite Object Count | |
Curve Object Present? | |
Curve Object Count | |
Point Object Present? | Yes |
Point Object Count | 133904180863 |
Solid Object Present? | |
Solid Object Count | |
Surface Object Present? | |
Surface Object Count |
Vector Representation
Topology Level | |
---|---|
Complex Object Present? | |
Complex Object Count | |
Composite Object Present? | |
Composite Object Count | |
Curve Object Present? | |
Curve Object Count | |
Point Object Present? | |
Point Object Count | |
Solid Object Present? | |
Solid Object Count | |
Surface Object Present? | |
Surface Object Count |
Reference Systems
Reference System
EPSG Code | EPSG:3857 | ||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Horizontal Resolution |
|||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||
Vertical Resolution |
|||||||||||||||||||||||||||||
|
Reference System
EPSG Code | EPSG:5703 | ||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Horizontal Resolution |
|||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||
Vertical Resolution |
|||||||||||||||||||||||||||||
|
Reference System
EPSG Code | |||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Horizontal Resolution |
|||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||
Vertical Resolution |
|||||||||||||||||||||||||||||
|
Access Information
Data License | |
---|---|
Data License URL | |
Data License Statement | |
* » Security Class | Unclassified |
* Security Classification System | |
Security Handling Description | |
• Data Access Policy | |
» Data Access Procedure |
Data is available online for bulk and custom downloads. |
• » Data Access Constraints |
None |
• Data Use Constraints |
Users should be aware that temporal changes may have occurred since this data set was collected and some parts of this data may no longer represent actual surface conditions. Users should not use this data for critical applications without a full awareness of its limitations. |
Metadata Access Constraints | |
Metadata Use Constraints |
Distribution Information
Start Date | 2024-06-21 |
---|---|
End Date | Present |
» Download URL | https://coast.noaa.gov/dataviewer/#/lidar/search/where:ID=10144/details/10144 |
Distributor | NOAA Office for Coastal Management (NOAA/OCM) (2024 - Present) |
File Name | Customized Download |
Description |
Create custom data files by choosing data area, product type, map projection, file format, datum, etc. A new metadata will be produced to reflect your request using this record as a base. Change to an orthometric vertical datum is one of the many options. |
File Date/Time | |
File Type (Deprecated) | |
Distribution Format | Not Applicable |
File Size | |
Application Version | |
Compression | Zip |
Review Status |
Start Date | 2024 |
---|---|
End Date | Present |
» Download URL | https://rockyweb.usgs.gov/vdelivery/Datasets/Staged/Elevation/LPC/Projects/AL_SWCentral_B22/AL_SWCentral_1_B22/LAZ/ |
Distributor | U.S. Geological Survey (2024 - Present) |
File Name | Bulk Download |
Description |
Bulk download of data files in LAZ format, UTM Zone 16N NAD83(2011), meters coordinates and NAVD88 (GEOID18) elevations in meters. |
File Date/Time | |
File Type (Deprecated) | |
Distribution Format | LAS/LAZ - LASer |
File Size | |
Application Version | |
Compression | LAZ |
Review Status |
Start Date | |
---|---|
End Date | |
» Download URL | |
Distributor | |
File Name | |
Description | |
File Date/Time | |
File Type | |
FGDC Content Type | |
File Size | |
Application Version | |
Compression | |
Review Status |
Start Date | |
---|---|
End Date | |
» Download URL | |
Distributor | |
File Name | |
Description | |
File Date/Time | |
File Type | |
FGDC Content Type | |
File Size | |
Application Version | |
Compression | |
Review Status |
Start Date | |
---|---|
End Date | |
» Download URL | |
Distributor | |
File Name | |
Description | |
File Date/Time | |
File Type | |
FGDC Content Type | |
File Size | |
Application Version | |
Compression | |
Review Status |
Archive Information
Location | |
---|---|
File Identifier | |
File Name | |
URL | |
Description | |
DOI | |
Archive Date | |
Archive Update Frequency |
Location | |
---|---|
File Identifier | |
File Name | |
URL | |
Description | |
DOI | |
Archive Date | |
Archive Update Frequency |
Location | |
---|---|
File Identifier | |
File Name | |
URL | |
Description | |
DOI | |
Archive Date | |
Archive Update Frequency |
URLs
URL | https://coast.noaa.gov/dataviewer/ |
---|---|
Name | NOAA's Office for Coastal Management (OCM) Data Access Viewer (DAV) |
URL Type | Online Resource |
File Resource Format | HTML |
Description |
The Data Access Viewer (DAV) allows a user to search for and download elevation, imagery, and land cover data for the coastal U.S. and its territories. The data, hosted by the NOAA Office for Coastal Management, can be customized and requested for free download through a checkout interface. An email provides a link to the customized data, while the original data set is available through a link within the viewer. |
URL | https://prd-tnm.s3.amazonaws.com/StagedProducts/Elevation/metadata/AL_SWCentral_B22/USGS_AL_SWCentral_B22_Project_Report.pdf |
---|---|
Name | USGS Project Report |
URL Type | Online Resource |
File Resource Format | |
Description |
Link to the USGS Project Report that provides information about the project, vertical accuracy results, and the point classes and sensors used. |
URL | https://prd-tnm.s3.amazonaws.com/index.html?prefix=StagedProducts/Elevation/metadata/AL_SWCentral_B22/AL_SWCentral_1_B22/ |
---|---|
Name | USGS Additional Info |
URL Type | Online Resource |
File Resource Format | |
Description |
Link to the reports, breaklines, metadata, and spatial metadata. |
URL | https://prd-tnm.s3.amazonaws.com/StagedProducts/Elevation/metadata/AL_SWCentral_B22/AL_SWCentral_1_B22/reports/project_report/AL_SWCentral_B22_LiDARMappingReport.pdf |
---|---|
Name | Lidar Report |
URL Type | Online Resource |
File Resource Format | |
Description |
Link to the lidar report |
URL | https://s3-us-west-2.amazonaws.com/usgs-lidar-public/AL_SWCentral_1_B22/ept.json |
---|---|
Name | USGS Entwine Point Tile (EPT) |
URL Type | Online Resource |
File Resource Format | json |
Description |
Entwine Point Tile (EPT) is a simple and flexible octree-based storage format for point cloud data. The data is organized in such a way that the data can be reasonably streamed over the internet, pulling only the points you need. EPT files can be queried to return a subset of the points that give you a representation of the area. As you zoom further in, you are requesting higher and higher densities. A dataset in EPT will contain a lot of files, however, the ept.json file describes all the rest. The EPT file can be used in Potree and QGIS to view the point cloud. |
URL | https://usgs.entwine.io/data/view.html?r=https://s3-us-west-2.amazonaws.com/usgs-lidar-public/AL_SWCentral_1_B22/ept.json |
---|---|
Name | USGS 3D View |
URL Type | Online Resource |
File Resource Format | |
Description |
Link to view the point cloud, using the Entwine Point Tile (EPT) format, in the 3D Potree viewer. |
URL | |
---|---|
Name | |
URL Type | |
File Resource Format | |
Description |
URL | |
---|---|
Name | |
URL Type | |
File Resource Format | |
Description |
URL | |
---|---|
Name | |
URL Type | |
File Resource Format | |
Description |
Activity Log
Activity Time | |
---|---|
Activity Type | |
Responsible Party | |
Description |
Activity Time | |
---|---|
Activity Type | |
Responsible Party | |
Description |
Activity Time | |
---|---|
Activity Type | |
Responsible Party | |
Description |
Issues
Issue Date | |
---|---|
Author | |
Issue |
Issue Date | |
---|---|
Author | |
Issue |
Issue Date | |
---|---|
Author | |
Issue |
Technical Environment
Description |
Inertial Explorer ver: 8.9; GeoCue Ver: 2020.1.22.1; Microstation CONNECT 10.12.00.40 ;TerraScan v021.034; LP360 ver: 2021.1.47.0; ArcMap ver: 10.7; Global Mapper ver: 18.1 |
---|
Data Quality
Representativeness | |
---|---|
Accuracy | |
Analytical Accuracy | |
Horizontal Positional Accuracy |
This data set was produced to meet ASPRS Positional Accuracy Standards for Digital Geospatial Data (2014)for a 20.5 (cm) RMSEx / RMSEy Horizontal Accuracy Class which equates to the Positional Horizontal Accuracy = +/- 50.2 cm at a 95% confidence level . |
Vertical Positional Accuracy |
This data set was produced to meet ASPRS Positional Accuracy Standards for Digital Geospatial Data (2014) for a 10-cm RMSEz Vertical Accuracy Class. USGS Determined Vertical Accuracy Tested NVA RMSEz = 7.22 cm Tested 95th percentile value for VVA is : 18.29 cm For more information see the USGS project report and the lidar report. The links to these reports are provided in the URL section of this metadata record. |
Quantitation Limits | |
Bias | |
Comparability | |
Completeness Measure | |
Precision | |
Analytical Precision | |
Field Precision | |
Sensitivity | |
Detection Limit | |
Completeness Report |
The RAW LAS data files included all data points collected. No points have been removed or excluded. A visual qualitative assessment was performed to ensure data completeness. No void areas or missing data exist. The RAW point cloud is of good quality and data passes Fundamental Vertical Accuracy specifications. Void areas (i.e., areas outside the project boundary but within the tiling scheme) are coded using a unique âNODATAâ value. This value is identified in the appropriate location within the file header. |
Conceptual Consistency |
Aerial LiDAR data covers the entire 4685 square mile Area of Interest intended for this project boundary.All LiDAR Point Cloud tiles show no edge artifacts or mismatches from tile to tile. Void areas (i.e., areas outside the project boundary but within the tiling scheme) are coded using a unique âNODATAâ value. This value is identified in the appropriate location within the file header. Data cover the entire area specified for this project. |
» Quality Control Procedures Employed |
Data Management
» Have Resources for Management of these Data Been Identified? | Yes |
---|---|
» Approximate Percentage of Budget for these Data Devoted to Data Management | Unknown |
» Do these Data Comply with the Data Access Directive? | Yes |
» Is Access to the Data Limited Based on an Approved Waiver? | |
» If Distributor (Data Hosting Service) is Needed, Please Indicate | |
» Approximate Delay Between Data Collection and Dissemination | |
» If Delay is Longer than Latency of Automated Processing, Indicate Under What Authority Data Access is Delayed | |
» Actual or Planned Long-Term Data Archive Location | NCEI-NC |
» Approximate Delay Between Data Collection and Archiving | |
» How Will the Data Be Protected from Accidental or Malicious Modification or Deletion Prior to Receipt by the Archive? |
Data is backed up to cloud storage. |
Lineage
» Lineage Statement |
The NOAA Office for Coastal Management (OCM) ingested references to the USGS Entwine Point Tiles (EPT) hosted on Amazon Web Services (AWS) into the Digital Coast Data Access Viewer (DAV). The DAV accesses the point cloud as it resides on AWS under the usgs-lidar-public-container. |
---|
Sources
Citation Title | USGS AWS Entwine Point Tile (EPT) |
---|---|
Contact Role Type | Publisher |
Contact Type | Organization |
Contact Name | USGS |
Publish Date | |
Extent Type | |
Extent Start Date/Time | |
Extent End Date/Time | |
Scale Denominator | |
Citation URL | https://s3-us-west-2.amazonaws.com/usgs-lidar-public/AL_SWCentral_1_B22/ept.json |
Citation URL Name | Entwine Point Tile (EPT) |
Citation URL Description | |
Source Contribution |
Citation Title | |
---|---|
Contact Role Type | |
Contact Type | |
Contact Name | |
Publish Date | |
Extent Type | |
Extent Start Date/Time | |
Extent End Date/Time | |
Citation URL | |
Citation URL Name | |
Citation URL Description | |
Scale Denominator |
Citation Title | |
---|---|
Contact Role Type | |
Contact Type | |
Contact Name | |
Publish Date | |
Extent Type | |
Extent Start Date/Time | |
Extent End Date/Time | |
Citation URL | |
Citation URL Name | |
Citation URL Description | |
Scale Denominator |
Citation Title | |
---|---|
Contact Role Type | |
Contact Type | |
Contact Name | |
Publish Date | |
Extent Type | |
Extent Start Date/Time | |
Extent End Date/Time | |
Citation URL | |
Citation URL Name | |
Citation URL Description | |
Scale Denominator |
Process Steps
Process Step Number | 1 |
---|---|
» Description |
Aerial LiDAR Acquisition: LiDAR acquisition was done using H.L Sonny Callahan Airport (KCQF), Bay Minette Municipal Airport (1R8) and Bessemer Airport (KEKY), as the base airport. DAS used dedicated GPS base stations located at the respective airports to support the aerial LiDAR acquisition. DAS used Leica's Terrain LiDAR Sensor (SN90524) for the acquisition. The project consisted of 247 flightlines totaling 7699.47 nautical miles. The acquisition was completed in 27 lifts from January 9th, 2023 - March 5th, 2023. Ground Control Survey: A survey was performed to support the acquisition of Light Detection and Ranging (LiDAR).The checkpoints were a combination of the following ground cover classification: Open Terrain, Urban Terrain, Bare Earth, High Grass, and Low Trees. All field survey observations were completed March 5th, 2023 with Leica GS18. |
Process Date/Time | 2023-03-05 00:00:00 |
Process Contact | |
Phone (Voice) | |
Email Address | |
Source |
Process Step Number | 2 |
---|---|
» Description |
LiDAR Data Processing: Inertial Explorer 8.9 software was used to compute inertial solution file (*.sol) for each mission using ground GPS base station. The resulting solution was checked to ensure a minimum accuracy of +/- 0.05m, combined separation, for horizontal and vertical positions. Inertial Explorer methodology integrates Inertial Navigation Solution by processing the GPS data and Inertial Measurement Unit (IMU). The software applies the reference lever arms for the GPS and IMU during the process to determine the trajectory (position and orientation) of the LiDAR sensor during the acquisition mission. Inertial Explorer generated graphical results was reviewed to ensure that the IMU data was healthy. These results are found in Appendix C.
Raw LiDAR sensor ranging data and the final solution sensor trajectory (*.sol), from Inertial Explorer, were processed in Leica’s HxMap software to produce LiDAR point cloud swath for each flight line in LAS version 1.4 file format.Quality control of the swath point cloud was performed to validate proper functioning of the sensor system, full coverage of the project area and point density of the LiDAR data. Swath point clouds were assigned unique file source identification. The data was found to be complete and consistent with the sensor calibration parameters. |
Process Date/Time | 2023-09-30 00:00:00 |
Process Contact | |
Phone (Voice) | |
Email Address | |
Source |
Process Step Number | 3 |
---|---|
» Description |
LiDAR Calibration:HxMap is the common workflow platform for Leica airborne sensors. The processing workflow involves; Ingest, Block Creation, LiDAR Matching, Quality Assurance (QA) and Product Generation.
LiDAR is processed in HxMap by generating point clouds from raw sensor data during the Ingest step. Noise filtering, sensor installation calibration and atmospheric condition parameters are also applied during the ingest process. Once all data is processed through ingest, they are assembled into a block for LiDAR Matching. The LiDAR Matching step resolves LiDAR registration errors which remain in the point clouds after sensor and installation calibration parameters are applied in the ingest step. QA tool is run on the Block after LiDAR Matching to verify quality of results. QA results are reviewed to ensure that, 95% of patches less than 5cm for Vertical Scan Direction and Vertical Line Separation. Ground control points are also included to assess absolute accuracy for the point cloud data. LiDAR products are finally generated in the Product Generation step as LAS swaths (LAS 1.4). Vertical (Z) shift (calculated from QA step) is also applied during the product generation. Flood inundations were identified in low lying areas within the project DPA. The inundation conditions in these areas resulted in poor returns in ground classification, resulting in thinning in bare earth digital elevation models (DEM) generated for these areas. A total of 438 Low confidence polygons were delineated and submitted as deliverables to help in data QC. Nine LAS tiles (16RCU682360, 16RCU802347, 16RCU817356, 16RDV072408, 16RDV087414, 16RDV087440, 16RDV102426, 16RDV147485 , 16SDC762705) are located in deep water bodies and therefore had no LiDAR returned data. |
Process Date/Time | 2023-09-30 00:00:00 |
Process Contact | |
Phone (Voice) | |
Email Address | |
Source |
Process Step Number | 4 |
---|---|
» Description |
Original point clouds in LAS/LAZ format were restructured as Entwine Point Tiles and stored on Amazon Web Services. The data were re-projected horizontally to WGS84 web mercator (EPSG 3857) and no changes were made to the vertical (NAVD88 GEOID18 meters). |
Process Date/Time | |
Process Contact | U.S. Geological Survey |
Phone (Voice) | |
Email Address | |
Source |
Process Step Number | 5 |
---|---|
» Description |
The NOAA Office for Coastal Management (OCM) created references to the Entwine Point Tiles (EPT) that were ingested into the NOAA Digital Coast Data Access Viewer (DAV). No changes were made to the data. The DAV will access the point cloud as it resides on Amazon Web Services (AWS) under the usgs-lidar-public container. This is the AWS URL being accessed: https://s3-us-west-2.amazonaws.com/usgs-lidar-public/AL_SWCentral_1_B22/ept.json |
Process Date/Time | 2024-06-21 00:00:00 |
Process Contact | Office for Coastal Management (OCM) |
Phone (Voice) | |
Email Address | |
Source |
Process Step Number | |
---|---|
» Description | |
Process Date/Time | |
Process Contact | |
Phone (Voice) | |
Email Address | |
Source |
Process Step Number | |
---|---|
» Description | |
Process Date/Time | |
Process Contact | |
Phone (Voice) | |
Email Address | |
Source |
Process Step Number | |
---|---|
» Description | |
Process Date/Time | |
Process Contact | |
Phone (Voice) | |
Email Address | |
Source |
Acquisition Information
Instruments
Instrument Unavailable Reason |
---|
Identifier | |
---|---|
Docucomp UUID | |
Instrument / Gear | |
Instrument Type | |
Description |
Identifier | |
---|---|
Docucomp UUID | |
Instrument / Gear | |
Instrument Type | |
Description |
Identifier | |
---|---|
Docucomp UUID | |
Instrument / Gear | |
Instrument Type | |
Description |
Platforms
Platform Unavailable Reason |
---|
Identifier | |||||||
---|---|---|---|---|---|---|---|
Docucomp UUID | |||||||
Description | |||||||
Mounted Instruments |
|||||||
|
Identifier | |||||||
---|---|---|---|---|---|---|---|
Docucomp UUID | |||||||
Description | |||||||
Mounted Instruments |
|||||||
|
Identifier | |||||||
---|---|---|---|---|---|---|---|
Docucomp UUID | |||||||
Description | |||||||
Mounted Instruments |
|||||||
|
FAQs
Date | |
---|---|
Author | |
Question | |
Answer |
Child Items
Rubric scores updated every 15m
Score | Type | Title |
---|---|---|
Related Items
Item Type | Relationship Type | Title |
---|---|---|
Catalog Details
Catalog Item ID | 72983 |
---|---|
Metadata Record Created By | Rebecca Mataosky |
Metadata Record Created | 2024-06-21 13:16+0000 |
Metadata Record Last Modified By | Rebecca Mataosky |
» Metadata Record Last Modified | 2024-06-21 13:59+0000 |
Metadata Record Published | 2024-06-21 |
Owner Org | OCMP |
Metadata Publication Status | Published Externally |
Do Not Publish? | N |
Metadata Workflow State | Published / External |
Metadata Last Review Date | 2024-06-21 |
Metadata Review Frequency | 1 Year |
Metadata Next Review Date | 2025-06-21 |
Tags |
---|