Data Management Plan
GUID: gov.noaa.nmfs.inport:62697 | Published / External
Data Management Plan
DMP Template v2.0.1 (2015-01-01)
Please provide the following information, and submit to the NOAA DM Plan Repository.Reference to Master DM Plan (if applicable)
As stated in Section IV, Requirement 1.3, DM Plans may be hierarchical. If this DM Plan inherits provisions from a higher-level DM Plan already submitted to the Repository, then this more-specific Plan only needs to provide information that differs from what was provided in the Master DM Plan.
1. General Description of Data to be Managed
The Project data set consists of a classified lidar point cloud The Geographical Extent of this dataset covers approximately 2215 square miles for the QL2 area covering Calhoun, Clarendon and Orangeburg counties in SC. The flight plan consisted of 201 survey lines and 3 control lines.
Ground Conditions: water at normal levels; no unusual inundation; no snow; leaf off
How the Withheld Points are Identified: Withheld (ignore) points were identified in the files using the standard LAS Withheld bit.
ANPS: 0.71 Meters
Tile Size: 5,000 US Feet
Spec: National Geospatial Program(NGP) Lidar Base Specification v1.3
LAS File Type: 1.4 type 6
Notes: Only a maximum of 4000 characters will be included.
Notes: Data collection is considered ongoing if a time frame of type "Continuous" exists.
Notes: All time frames from all extent groups are included.
Notes: All geographic areas from all extent groups are included.
(e.g., digital numeric data, imagery, photographs, video, audio, database, tabular data, etc.)
(e.g., satellite, airplane, unmanned aerial system, radar, weather station, moored buoy, research vessel, autonomous underwater vehicle, animal tagging, manual surveys, enforcement activities, numerical model, etc.)
2. Point of Contact for this Data Management Plan (author or maintainer)
Notes: The name of the Person of the most recent Support Role of type "Metadata Contact" is used. The support role must be in effect.
Notes: The name of the Organization of the most recent Support Role of type "Metadata Contact" is used. This field is required if applicable.
3. Responsible Party for Data Management
Program Managers, or their designee, shall be responsible for assuring the proper management of the data produced by their Program. Please indicate the responsible party below.
Notes: The name of the Person of the most recent Support Role of type "Data Steward" is used. The support role must be in effect.
4. Resources
Programs must identify resources within their own budget for managing the data they produce.
5. Data Lineage and Quality
NOAA has issued Information Quality Guidelines for ensuring and maximizing the quality, objectivity, utility, and integrity of information which it disseminates.
(describe or provide URL of description):
Process Steps:
- 2018-04-11 00:00:00 - Aerial LiDAR Acquisition: Aerial data collection was acquired, in Nineteen (19) Missions, using the Leica ALS80 SN# 8137 and SN# 8235 at an altitude of 5,430 feet AGL for QL2. This was to support a 2 ppm^2 for QL2 LiDAR point cloud. Airborne GPS and IMU data was collected during the acquisition and supported by Leica GS15 and GPS 1200 base stations that occupied temporary monuments in conjunction with CORS stations, Data acquisition started April 11, 2018 and it was completed April 18, 2018. Ground Control Survey: A survey was performed to support the acquisition of Light Detection and Ranging (LiDAR). The control network involved a total of 135 check points (76 NVA and 59 VVA). The points were a combination of the following ground cover classification: Open Terrain, Urban Terrain, Bare Earth, High Grass, and Low Trees. All field survey observations were conducted between April 11, 2018 and it was completed April 13, 2018 with Leica GPS GS15 and 1200 equipment.
- 2018-04-20 00:00:00 - LiDAR Pre-processing: Airborne GPS and IMU data were merged to develop a Smooth Best Estimate of Trajectory (SBET) of the LiDAR system for each mission. LiDAR ranging data were initially calibrated using previous best parameter for this instrument and aircraft. Relative calibration was evaluated using advanced plane-matching analysis and parameter corrections derived. This process was repeated interactively until residual errors between overlapping swaths, across all project lifts, was reduced to 2 cm or less. Raw data NVA were checked using surveyed check points.
- 2018-06-03 00:00:00 - RAW Data Processing: The Initial processing of the GPS data was processed using Inertial Explorer producing a solution file for each mission. Leica CloudPro software was then used to generate georeferenced laser returns into LAS 1.4 file format for each flight-line per each mission, this went through an initial Quality Control of the overlap between the flight-line swaths.
- 2018-06-25 00:00:00 - LiDAR Post-processing: The calibrated and controlled LiDAR swaths were processed using automatic point classification routines in TerraSolid software. These routines operate against the entire collection (all swaths, all lifts), eliminating character differences between files. Data were then distributed as virtual tiles to experienced LiDAR analysts for localized automatic classification, manual editing, and peer-based QC checks. Supervisory QC monitoring of work in progress and completed editing ensured consistency of classification character and adherence to project requirements across the entire project. All classification tags are stored in the original swath files. After completion of classification and final QC approval, the NVA and VVA for the project are calculated. Sample areas for each land cover type present in the project were extracted and forwarded to the client, along with the results of the accuracy tests. Upon acceptance, the complete classified LiDAR swath files were delivered to the client.
- 2018-06-28 00:00:00 - LiDAR Classification: The calibrated LiDAR data went through automated classification routines and then manually edited and checked. The LiDAR point cloud data was classified into the following classes: 1-unclassified*, 2-ground, 7-low noise, 9-water, 17-bridges, and 18-high noise, 20-Ignored Ground, 21-Snow, 22-Temporal Exclusion
- NOAA OCM retrieved 6,148 laz files from the USGS rockyftp website. The files The NOAA Office for Coastal Management (OCM) downloaded this data set from this USGS rockyFTP website. The number of files downloaded and processed was 6,148. The data were in Albers (NAD83 2011) coordinates and NAVD88 (Geoid12b) elevations with all units in meterst. The data were classified as: 1 - Unclassified, 2 - Ground, 7 - Low Noise, 9 - Water,, 17 - Bridge Decks, 18 - High Noise, 20 - Ignored Ground. OCM processed all classifications of points to the Digital Coast Data Access Viewer (DAV). OCM performed the following processing on the data for Digital Coast storage and provisioning purposes: 1. An internal OCM script was run to check the number of points by classification and by flight ID and the gps and intensity ranges. 2. Internal OCM scripts were run on the laz files to convert from orthometric (NAVD88) elevations to ellipsoid elevations using the Geoid12b model, to convert to geographic coordinates, to assign the geokeys, to sort the data by gps time and zip the data to database and to http.
(describe or provide URL of description):
6. Data Documentation
The EDMC Data Documentation Procedural Directive requires that NOAA data be well documented, specifies the use of ISO 19115 and related standards for documentation of new data, and provides links to resources and tools for metadata creation and validation.
Missing/invalid information:
- 1.7. Data collection method(s)
- 3.1. Responsible Party for Data Management
- 5.2. Quality control procedures employed
- 7.1.1. If data are not available or has limitations, has a Waiver been filed?
- 7.4. Approximate delay between data collection and dissemination
- 8.3. Approximate delay between data collection and submission to an archive facility
(describe or provide URL of description):
7. Data Access
NAO 212-15 states that access to environmental data may only be restricted when distribution is explicitly limited by law, regulation, policy (such as those applicable to personally identifiable information or protected critical infrastructure information or proprietary trade information) or by security requirements. The EDMC Data Access Procedural Directive contains specific guidance, recommends the use of open-standard, interoperable, non-proprietary web services, provides information about resources and tools to enable data access, and includes a Waiver to be submitted to justify any approach other than full, unrestricted public access.
None
Notes: The name of the Organization of the most recent Support Role of type "Distributor" is used. The support role must be in effect. This information is not required if an approved access waiver exists for this data.
Notes: This field is required if a Distributor has not been specified.
https://noaa-nos-coastal-lidar-pds.s3.amazonaws.com/laz/geoid18/9166/index.html
Notes: All URLs listed in the Distribution Info section will be included. This field is required if applicable.
Data is available online for bulk or custom downloads
Notes: This field is required if applicable.
8. Data Preservation and Protection
The NOAA Procedure for Scientific Records Appraisal and Archive Approval describes how to identify, appraise and decide what scientific records are to be preserved in a NOAA archive.
(Specify NCEI-MD, NCEI-CO, NCEI-NC, NCEI-MS, World Data Center (WDC) facility, Other, To Be Determined, Unable to Archive, or No Archiving Intended)
Notes: This field is required if archive location is World Data Center or Other.
Notes: This field is required if archive location is To Be Determined, Unable to Archive, or No Archiving Intended.
Notes: Physical Location Organization, City and State are required, or a Location Description is required.
Discuss data back-up, disaster recovery/contingency planning, and off-site data storage relevant to the data collection
Data is backed up to tape and to cloud storage.
9. Additional Line Office or Staff Office Questions
Line and Staff Offices may extend this template by inserting additional questions in this section.