2016 - 2017 FEMA Lidar DEM: Southwest Virginia & Northeast West Virginia
Data Set (DS) | OCM Partners (OCMP)GUID: gov.noaa.nmfs.inport:75003 | Updated: March 3, 2025 | Published / External
- View As
- View in Hierarchy
Summary
Short Citation
OCM Partners, 2025: 2016 - 2017 FEMA Lidar DEM: Southwest Virginia & Northeast West Virginia, https://www.fisheries.noaa.gov/inport/item/75003.
Full Citation Examples
Virginia (VA_FEMA_R3_Southwest _A and VA_FEMA_R3_Southwest_B)
Leading Edge Geomatics (LEG) collected 6069.91 square miles in the Virginia counties of Bland, Buchanan, Craig (partial), Dickenson, Giles, Grayson, Lee, Russell, Scott, Smyth, Tazewell, Washington, Wise and Wythe, as well as the cities of Bristol, Galax and Norton in Virginia and the city of Bluefield in West Virginia. The nominal pulse spacing for this project was 1 point every 0.7 meters. Dewberry used proprietary procedures to classify the LAS according to project specifications: 1-Unclassified, 2-Ground, 7-Low Noise, 9-Water, 10-Ignored Ground due to breakline proximity, 17- Bridges, 18-High Noise. Dewberry produced 3D breaklines and combined these with the final lidar data to produce seamless hydro flattened DEMs for the project area. The data was formatted according to the client provided tile naming convention with each tile covering an area of 1,500 meters by 1,500 meters. A total of 7,349 tiles were produced for the Virginia Southwest AOI.
West Virginia (VA_FEMA_R3_Northeast)
Axis Geospatial, LLC (Axis) collected 2,640 square miles in the West Virginia counties of Mineral, Hampshire, Grant, Hardy and Pendleton. The nominal pulse spacing for this project was 1 point every 0.7 meters. Dewberry used proprietary procedures to classify the LAS according to project specifications: 0-Never Classified, 1-Unclassified, 2-Ground, 7-Low Noise, 9-Water, 10-Ignored Ground due to breakline proximity, 17- Bridges, 18-High Noise. Dewberry produced 3D breaklines and combined these with the final lidar data to produce seamless hydro flattened DEMs for the project area. The data was formatted according to the client provided tile naming convention with each tile covering an area of 1,500 meters by 1,500 meters. A total of 3,242 tiles were produced for the entire project.
This metadata record supports the data entry in the NOAA Digital Coast Data Access Viewer (DAV). For this data set, the DAV is leveraging the GeoTIFF files hosted by USGS on Amazon Web Services.
Distribution Information
-
Format: Not Applicable
Create custom data files by choosing data area, map projection, file format, etc. A new metadata will be produced to reflect your request using this record as a base.
-
GeoTIFF
Bulk download of data files in GeoTIFF format, UTM 17N NAD83(2011) meters coordinates and elevations in NAVD88 (Geoid12B) meters.
-
GeoTIFF
Bulk download of data files in GeoTIFF format, UTM 17N NAD83(2011) meters coordinates and elevations in NAVD88 (Geoid12B) meters.
-
GeoTIFF
Bulk download of data files in GeoTIFF format, UTM 17N NAD83(2011) meters coordinates and elevations in NAVD88 (Geoid12B) meters.
None
Users should be aware that temporal changes may have occurred since this data set was collected and some parts of this data may no longer represent actual surface conditions. Users should not use this data for critical applications without a full awareness of its limitations.
Controlled Theme Keywords
DIGITAL ELEVATION/TERRAIN MODEL (DEM), elevation, TERRAIN ELEVATION
Child Items
No Child Items for this record.
Contact Information
Point of Contact
NOAA Office for Coastal Management (NOAA/OCM)
coastal.info@noaa.gov
(843) 740-1202
https://coast.noaa.gov
Metadata Contact
NOAA Office for Coastal Management (NOAA/OCM)
coastal.info@noaa.gov
(843) 740-1202
https://coast.noaa.gov
Extents
-83.708724° W,
-80.182698° E,
37.542897° N,
36.528354° S
Southwest Virginia (VA_FEMA_R3_Southwest_A and VA_FEMA_R3_Southwest_B)
2016-11-03 - 2017-04-17
Dates of collection for Southwest Virginia (VA_FEMA_R3_Southwest_A and VA_FEMA_R3_Southwest_B)
Item Identification
Title: | 2016 - 2017 FEMA Lidar DEM: Southwest Virginia & Northeast West Virginia |
---|---|
Short Name: | va2016_sw_va_ne_wv_dem_m10280_metadata |
Status: | Completed |
Creation Date: | 2016 |
Publication Date: | 2018 |
Abstract: |
Virginia (VA_FEMA_R3_Southwest _A and VA_FEMA_R3_Southwest_B) Leading Edge Geomatics (LEG) collected 6069.91 square miles in the Virginia counties of Bland, Buchanan, Craig (partial), Dickenson, Giles, Grayson, Lee, Russell, Scott, Smyth, Tazewell, Washington, Wise and Wythe, as well as the cities of Bristol, Galax and Norton in Virginia and the city of Bluefield in West Virginia. The nominal pulse spacing for this project was 1 point every 0.7 meters. Dewberry used proprietary procedures to classify the LAS according to project specifications: 1-Unclassified, 2-Ground, 7-Low Noise, 9-Water, 10-Ignored Ground due to breakline proximity, 17- Bridges, 18-High Noise. Dewberry produced 3D breaklines and combined these with the final lidar data to produce seamless hydro flattened DEMs for the project area. The data was formatted according to the client provided tile naming convention with each tile covering an area of 1,500 meters by 1,500 meters. A total of 7,349 tiles were produced for the Virginia Southwest AOI. West Virginia (VA_FEMA_R3_Northeast) Axis Geospatial, LLC (Axis) collected 2,640 square miles in the West Virginia counties of Mineral, Hampshire, Grant, Hardy and Pendleton. The nominal pulse spacing for this project was 1 point every 0.7 meters. Dewberry used proprietary procedures to classify the LAS according to project specifications: 0-Never Classified, 1-Unclassified, 2-Ground, 7-Low Noise, 9-Water, 10-Ignored Ground due to breakline proximity, 17- Bridges, 18-High Noise. Dewberry produced 3D breaklines and combined these with the final lidar data to produce seamless hydro flattened DEMs for the project area. The data was formatted according to the client provided tile naming convention with each tile covering an area of 1,500 meters by 1,500 meters. A total of 3,242 tiles were produced for the entire project. This metadata record supports the data entry in the NOAA Digital Coast Data Access Viewer (DAV). For this data set, the DAV is leveraging the GeoTIFF files hosted by USGS on Amazon Web Services. |
Purpose: |
The purpose of this lidar data was to produce high accuracy 3D elevation products, including tiled lidar in LAS 1.4 format, 3D breaklines, and 1 meter cell size hydro flattened Digital Elevation Models (DEMs). All products follow and comply with USGS Lidar Base Specification Version 1.2. |
Keywords
Theme Keywords
Thesaurus | Keyword |
---|---|
Global Change Master Directory (GCMD) Science Keywords |
EARTH SCIENCE > LAND SURFACE > TOPOGRAPHY > TERRAIN ELEVATION
|
Global Change Master Directory (GCMD) Science Keywords |
EARTH SCIENCE > LAND SURFACE > TOPOGRAPHY > TERRAIN ELEVATION > DIGITAL ELEVATION/TERRAIN MODEL (DEM)
|
ISO 19115 Topic Category |
elevation
|
Spatial Keywords
Thesaurus | Keyword |
---|---|
Global Change Master Directory (GCMD) Location Keywords |
CONTINENT > NORTH AMERICA > UNITED STATES OF AMERICA
|
Global Change Master Directory (GCMD) Location Keywords |
CONTINENT > NORTH AMERICA > UNITED STATES OF AMERICA > VIRGINIA
|
Global Change Master Directory (GCMD) Location Keywords |
CONTINENT > NORTH AMERICA > UNITED STATES OF AMERICA > WEST VIRGINIA
|
Global Change Master Directory (GCMD) Location Keywords |
VERTICAL LOCATION > LAND SURFACE
|
Instrument Keywords
Thesaurus | Keyword |
---|---|
Global Change Master Directory (GCMD) Instrument Keywords |
LIDAR > Light Detection and Ranging
|
Platform Keywords
Thesaurus | Keyword |
---|---|
Global Change Master Directory (GCMD) Platform Keywords |
Airplane > Airplane
|
Physical Location
Organization: | Office for Coastal Management |
---|---|
City: | Charleston |
State/Province: | SC |
Data Set Information
Data Set Scope Code: | Data Set |
---|---|
Data Set Type: | Elevation |
Maintenance Frequency: | As Needed |
Data Presentation Form: | Model (digital) |
Distribution Liability: |
Any conclusions drawn from the analysis of this information are not the responsibility of NOAA, the Office for Coastal Management or its partners. |
Data Set Credit: | U.S. Geological Survey |
Support Roles
Data Steward
Date Effective From: | 2025 |
---|---|
Date Effective To: | |
Contact (Organization): | NOAA Office for Coastal Management (NOAA/OCM) |
Address: |
2234 South Hobson Ave Charleston, SC 29405-2413 |
Email Address: | coastal.info@noaa.gov |
Phone: | (843) 740-1202 |
URL: | https://coast.noaa.gov |
Distributor
Date Effective From: | 2025 |
---|---|
Date Effective To: | |
Contact (Organization): | NOAA Office for Coastal Management (NOAA/OCM) |
Address: |
2234 South Hobson Ave Charleston, SC 29405-2413 |
Email Address: | coastal.info@noaa.gov |
Phone: | (843) 740-1202 |
URL: | https://coast.noaa.gov |
Distributor
Date Effective From: | 2018 |
---|---|
Date Effective To: | |
Contact (Organization): | U.S. Geological Survey |
Address: |
12201 Sunrise Valley Drive Reston, VA 20191 USA |
URL: | USGS Home |
Metadata Contact
Date Effective From: | 2025 |
---|---|
Date Effective To: | |
Contact (Organization): | NOAA Office for Coastal Management (NOAA/OCM) |
Address: |
2234 South Hobson Ave Charleston, SC 29405-2413 |
Email Address: | coastal.info@noaa.gov |
Phone: | (843) 740-1202 |
URL: | https://coast.noaa.gov |
Point of Contact
Date Effective From: | 2025 |
---|---|
Date Effective To: | |
Contact (Organization): | NOAA Office for Coastal Management (NOAA/OCM) |
Address: |
2234 South Hobson Ave Charleston, SC 29405-2413 |
Email Address: | coastal.info@noaa.gov |
Phone: | (843) 740-1202 |
URL: | https://coast.noaa.gov |
Extents
Currentness Reference: | Ground Condition |
---|
Extent Group 1
Extent Group 1 / Geographic Area 1
W° Bound: | -83.708724 | |
---|---|---|
E° Bound: | -80.182698 | |
N° Bound: | 37.542897 | |
S° Bound: | 36.528354 | |
Description |
Southwest Virginia (VA_FEMA_R3_Southwest_A and VA_FEMA_R3_Southwest_B) |
Extent Group 1 / Time Frame 1
Time Frame Type: | Range |
---|---|
Start: | 2016-11-03 |
End: | 2017-04-17 |
Description: |
Dates of collection for Southwest Virginia (VA_FEMA_R3_Southwest_A and VA_FEMA_R3_Southwest_B) |
Extent Group 2
Extent Group 2 / Geographic Area 1
W° Bound: | -79.654337 | |
---|---|---|
E° Bound: | -78.327515 | |
N° Bound: | 39.641471 | |
S° Bound: | 38.393677 | |
Description |
Northeast West Virginia (VA_FEMA_R3_Northeast) |
Extent Group 2 / Time Frame 1
Time Frame Type: | Range |
---|---|
Start: | 2017-03-23 |
End: | 2017-04-27 |
Description: |
Dates of collection for Northeast West Virginia (VA_FEMA_R3_Northeast) |
Spatial Information
Spatial Resolution
Horizontal Distance: | 1.0 Meter |
---|
Spatial Representation
Representations Used
Grid: | Yes |
---|---|
Vector: | No |
Text / Table: | No |
TIN: | No |
Stereo Model: | No |
Video: | No |
Reference Systems
Reference System 1
Coordinate Reference System |
|||||||||||||||||||||||
|
Reference System 2
Coordinate Reference System |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Access Information
Security Class: | Unclassified |
---|---|
Data Access Procedure: |
Data is available online for bulk and custom downloads. |
Data Access Constraints: |
None |
Data Use Constraints: |
Users should be aware that temporal changes may have occurred since this data set was collected and some parts of this data may no longer represent actual surface conditions. Users should not use this data for critical applications without a full awareness of its limitations. |
Distribution Information
Distribution 1
Start Date: | 2025-03-04 |
---|---|
End Date: | Present |
Download URL: | https://coast.noaa.gov/dataviewer/#/lidar/search/where:ID=10280/details/10280 |
Distributor: | NOAA Office for Coastal Management (NOAA/OCM) (2025 - Present) |
File Name: | Customized Download |
Description: |
Create custom data files by choosing data area, map projection, file format, etc. A new metadata will be produced to reflect your request using this record as a base. |
Distribution Format: | Not Applicable |
Compression: | Zip |
Distribution 2
Start Date: | 2018 |
---|---|
End Date: | Present |
Download URL: | https://prd-tnm.s3.amazonaws.com/index.html?prefix=StagedProducts/Elevation/OPR/Projects/VA_FEMA_R3_SW_Lidar_2016_D16/VA_FEMA_R3_Northeast_2016/TIFF/ |
Distributor: | U.S. Geological Survey (2018 - Present) |
File Name: | Bulk Download - VA_FEMA_R3_Northeast |
Description: |
Bulk download of data files in GeoTIFF format, UTM 17N NAD83(2011) meters coordinates and elevations in NAVD88 (Geoid12B) meters. |
Distribution Format: | GeoTIFF |
Distribution 3
Start Date: | 2018 |
---|---|
End Date: | Present |
Download URL: | https://prd-tnm.s3.amazonaws.com/index.html?prefix=StagedProducts/Elevation/OPR/Projects/VA_FEMA_R3_SW_Lidar_2016_D16/VA_FEMA_R3_Southwest_A_2016/TIFF/ |
Distributor: | U.S. Geological Survey (2018 - Present) |
File Name: | Bulk Download - VA_FEMA_R3_Southwest_A |
Description: |
Bulk download of data files in GeoTIFF format, UTM 17N NAD83(2011) meters coordinates and elevations in NAVD88 (Geoid12B) meters. |
Distribution Format: | GeoTIFF |
Distribution 4
Start Date: | 2018 |
---|---|
End Date: | Present |
Download URL: | https://prd-tnm.s3.amazonaws.com/index.html?prefix=StagedProducts/Elevation/OPR/Projects/VA_FEMA_R3_SW_Lidar_2016_D16/VA_FEMA_R3_Southwest_B_2016/TIFF/ |
Distributor: | U.S. Geological Survey (2018 - Present) |
File Name: | Bulk Download - VA_FEMA_R3_Southwest_B |
Description: |
Bulk download of data files in GeoTIFF format, UTM 17N NAD83(2011) meters coordinates and elevations in NAVD88 (Geoid12B) meters. |
Distribution Format: | GeoTIFF |
URLs
URL 1
URL: | https://coast.noaa.gov/dataviewer/ |
---|---|
Name: | NOAA's Office for Coastal Management (OCM) Data Access Viewer (DAV) |
URL Type: |
Online Resource
|
File Resource Format: | HTML |
Description: |
The Data Access Viewer (DAV) allows a user to search for and download elevation, imagery, and land cover data for the coastal U.S. and its territories. The data, hosted by the NOAA Office for Coastal Management, can be customized and requested for free download through a checkout interface. An email provides a link to the customized data, while the original data set is available through a link within the viewer. |
URL 2
URL: | https://prd-tnm.s3.amazonaws.com/StagedProducts/Elevation/metadata/VA__FEMA_R3_SW_Lidar_2016_D16/VA_FEMA_R3_Southwest_A_2016/reports/Virginia_Southwest_Lidar_Project_Report.pdf |
---|---|
Name: | Lidar Report |
URL Type: |
Online Resource
|
File Resource Format: | |
Description: |
Link to the lidar report |
URL 3
URL: | https://prd-tnm.s3.amazonaws.com/StagedProducts/Elevation/metadata/VA__FEMA_R3_SW_Lidar_2016_D16/VA_FEMA_R3_Southwest_A_2016/reports/Appendix%20D%20-%20Final_Vertical_Accuracy_Report_SVA_FEMA_R3_SW_Lidar_2016_D16.pdf |
---|---|
Name: | Vertical Accuracy Report |
URL Type: |
Online Resource
|
File Resource Format: | |
Description: |
Link to the vertical accuracy report. |
URL 4
URL: | https://prd-tnm.s3.amazonaws.com/index.html?prefix=StagedProducts/Elevation/metadata/VA__FEMA_R3_SW_Lidar_2016_D16/ |
---|---|
Name: | USGS Additional Info |
URL Type: |
Online Resource
|
File Resource Format: | |
Description: |
Link to the reports, breaklines, metadata, and spatial metadata. |
Technical Environment
Description: |
Microsoft Windows 7 Enterprise Service Pack 1; ESRI ArcCatalog 10.3 |
---|
Data Quality
Horizontal Positional Accuracy: |
Virginia (VA_FEMA_R3_Southwest _A and VA_FEMA_R3_Southwest_B) Lidar vendors calibrate their lidar systems during installation of the system and then again for every project acquired. Typical calibrations include cross flights that capture features from multiple directions that allow adjustments to be performed so that the captured features are consistent between all swaths and cross flights from all directions. Thirty eight (38) checkpoints were used for horizontal accuracy testing. This dataset was tested to meet ASPRS Positional Accuracy Standards for Digital Geospatial Data (2014) for a 41 cm RMSEx/RMSEy Horizontal Accuracy Class which equates to Positional Horizontal Accuracy = +/- 1 meter at a 95% confidence level. Actual positional accuracy of this dataset was found to be RMSEx = 23.7 cm and RMSEy = 20.8 cm which equates to +/- 54.6 cm at 95% confidence level or 31.6 cm RMSEr. West Virginia (VA_FEMA_R3_Northeast) Lidar vendors calibrate their lidar systems during installation of the system and then again for every project acquired. Typical calibrations include cross flights that capture features from multiple directions that allow adjustments to be performed so that the captured features are consistent between all swaths and cross flights from all directions. Twenty Five (25) checkpoints were used for horizontal accuracy testing. This dataset was tested to meet ASPRS Positional Accuracy Standards for Digital Geospatial Data (2014) for a 41 cm RMSEx/RMSEy Horizontal Accuracy Class which equates to Positional Horizontal Accuracy = +/- 1 meter at a 95% confidence level. Actual positional accuracy of this dataset was found to be RMSEx = 34.1 cm and RMSEy = 15.1 cm which equates to +/- 64.5 cm at 95% confidence level or 37.2 cm RMSEr. |
---|---|
Vertical Positional Accuracy: |
Virginia (VA_FEMA_R3_Southwest _A and VA_FEMA_R3_Southwest_B) The vertical accuracy of the bare earth DEMs was tested by Dewberry with 199 independent survey checkpoints. The survey checkpoints are evenly distributed throughout the project area and are located in areas of non-vegetated terrain, including bare earth, open terrain, and urban terrain (116), and vegetated terrain, including forest, brush, tall weeds, crops, and high grass (83). The vertical accuracy is tested by comparing survey checkpoints to a triangulated irregular network (TIN) that is created from the lidar ground points. Checkpoints are always compared to interpolated surfaces created from the lidar point cloud because it is unlikely that a survey checkpoint will be located at the location of a discrete lidar point. All checkpoints located in non-vegetated terrain were used to compute the Non-vegetated Vertical Accuracy (NVA). Project specifications required a NVA of 19.6 cm at the 95% confidence level based on RMSEz (10 cm) x 1.9600. All checkpoints located in vegetated terrain were used to compute the Vegetated Vertical Accuracy (VVA). Project specifications required a VVA of 29.4 cm based on the 95th percentile. The DEM dataset was tested to meet ASPRS Positional Accuracy Standards for Digital Geospatial Data (2014) for a 10 cm RMSEz Vertical Accuracy Class. Actual NVA accuracy was found to be RMSEz = 6.0 cm, equating to +/- 11.8 cm at 95% confidence level. Actual VVA accuracy was found to be +/- 21.0 cm at the 95th percentile. The 5% outliers consisted of 4 checkpoints that are larger than the 95th percentile. These checkpoints have DZ values ranging between -33.3 cm and 42.2 cm. West Virginia (VA_FEMA_R3_Northeast) The vertical accuracy of the bare earth DEMs will be tested by Dewberry with 109 independent survey checkpoints. The survey checkpoints are evenly distributed throughout the project area and are located in areas of non-vegetated terrain, including bare earth, open terrain, and urban terrain (64), and vegetated terrain, including forest, brush, tall weeds, crops, and high grass (45). The vertical accuracy is tested by comparing survey checkpoints to a triangulated irregular network (TIN) that is created from the lidar ground points. Checkpoints are always compared to interpolated surfaces created from the lidar point cloud because it is unlikely that a survey checkpoint will be located at the location of a discrete lidar point. All checkpoints located in non-vegetated terrain were used to compute the Non-vegetated Vertical Accuracy (NVA). Project specifications required a NVA of 19.6 cm at the 95% confidence level based on RMSEz (10 cm) x 1.9600. All checkpoints located in vegetated terrain were used to compute the Vegetated Vertical Accuracy (VVA). Project specifications required a VVA of 29.4 cm based on the 95th percentile. The DEM dataset was tested to meet ASPRS Positional Accuracy Standards for Digital Geospatial Data (2014) for a 10 cm RMSEz Vertical Accuracy Class. Actual NVA accuracy was found to be RMSEz = 6.2 cm, equating to +/- 12.1 cm at 95% confidence level. Actual VVA accuracy was found to be +/- 13.8 cm at the 95th percentile. The 5% outliers consisted of 2 checkpoints that are larger than the 95th percentile. These checkpoints have DZ values ranging between 17.5 cm and 20.7 cm. |
Completeness Report: |
A visual qualitative assessment was performed to ensure data completeness and full tiles. No void or missing data exists. |
Conceptual Consistency: |
Data covers the project boundary. |
Data Management
Have Resources for Management of these Data Been Identified?: | Yes |
---|---|
Approximate Percentage of Budget for these Data Devoted to Data Management: | Unknown |
Do these Data Comply with the Data Access Directive?: | Yes |
Actual or Planned Long-Term Data Archive Location: | NCEI-NC |
How Will the Data Be Protected from Accidental or Malicious Modification or Deletion Prior to Receipt by the Archive?: |
Data is backed up to cloud storage. |
Lineage
Lineage Statement: |
The NOAA Office for Coastal Management (OCM) ingested references to the USGS GeoTIFF files that are hosted on Amazon Web Services (AWS), into the Digital Coast Data Access Viewer (DAV). The DAV accesses the raster data as it resides on AWS. |
---|
Sources
USGS GeoTIFF Files - VA_FEMA_R3_Northeast
Contact Role Type: | Publisher |
---|---|
Contact Type: | Organization |
Contact Name: | USGS |
Citation URL: | https://prd-tnm.s3.amazonaws.com/index.html?prefix=StagedProducts/Elevation/OPR/Projects/VA_FEMA_R3_SW_Lidar_2016_D16/VA_FEMA_R3_Northeast_2016/TIFF/ |
Citation URL Name: | USGS GeoTIFF Files for VA_FEMA_R3_Northeast |
USGS GeoTIFF Files - VA_FEMA_R3_Southwest_A
Contact Role Type: | Publisher |
---|---|
Contact Type: | Organization |
Contact Name: | USGS |
Citation URL: | https://prd-tnm.s3.amazonaws.com/index.html?prefix=StagedProducts/Elevation/OPR/Projects/VA_FEMA_R3_SW_Lidar_2016_D16/VA_FEMA_R3_Southwest_A_2016/TIFF/ |
Citation URL Name: | USGS GeoTIFF Files for VA_FEMA_R3_Southwest_A |
USGS GeoTIFF Files - VA_FEMA_R3_Southwest_B
Contact Role Type: | Publisher |
---|---|
Contact Type: | Organization |
Contact Name: | USGS |
Citation URL: | https://prd-tnm.s3.amazonaws.com/index.html?prefix=StagedProducts/Elevation/OPR/Projects/VA_FEMA_R3_SW_Lidar_2016_D16/VA_FEMA_R3_Southwest_B_2016/TIFF/ |
Citation URL Name: | USGS GeoTIFF Files for VA_FEMA_R3_Southwest_B |
Process Steps
Process Step 1
Description: |
Data for the Virginia portion of the VA FEMA Lidar project was acquired by Leading Edge Geomatics (LEG). The project area included approximately 6069.91 contiguous square miles or 15720.99 square kilometers for a portion of Virginia. Leading Edge Geomatics, LLC operated a Piper Navajo C-GKCN outfitted with a Riegl 780 dual channel laser scanner lidar system . The data was delivered in the UTM coordinate system, meters, zone 17, horizontal datum NAD83 (2011), vertical datum NAVD88, Geoid 12B. Deliverables for the project included a raw (unclassified) calibrated lidar point cloud, survey control, and a final acquisition/calibration report. The calibration process considered all errors inherent with the equipment including errors in GPS, IMU, and sensor specific parameters. Adjustments were made to achieve a flight line to flight line data match (relative calibration) and subsequently adjusted to control for absolute accuracy. Process steps to achieve this are as follows: Rigorous lidar calibration: all sources of error such as the sensor's ranging and torsion parameters, atmospheric variables, GPS conditions, and IMU offsets were analyzed and removed to the highest level possible. This method addresses all errors, both vertical and horizontal in nature. Ranging, atmospheric variables, and GPS conditions affect the vertical position of the surface, whereas IMU offsets and torsion parameters affect the data horizontally. The horizontal accuracy is proven through repeatability: when the position of features remains constant no matter what direction the plane was flying and no matter where the feature is positioned within the swath, relative horizontal accuracy is achieved. Absolute horizontal accuracy is achieved through the use of differential GPS with base lines shorter than 25 miles. The base station is set at a temporary monument that is 'tied-in' to the CORS network. The same position is used for every lift, ensuring that any errors in its position will affect all data equally and can therefore be removed equally. Vertical accuracy is achieved through the adjustment to ground control survey points within the finished product. Although the base station has absolute vertical accuracy, adjustments to sensor parameters introduces vertical error that must be normalized in the final (mean) adjustment. The withheld and overlap bits are set and all headers, appropriate point data records, and variable length records, including spatial reference information, are updated in GeoCue software and then verified using proprietary Dewberry tools. |
---|---|
Process Date/Time: | 2016-12-01 00:00:00 |
Process Step 2
Description: |
Data for the West Virginia portion of the VA FEMA Lidar project was acquired by Axis Geospatial, LLC (Axis). The project area included approximately 2,640 contiguous square miles or 6,837 square kilometers for a portion of West Virginia. Axis Geospatial, LLC operated a Cessna 206H single engine aircraft (N223TC) outfitted with a Riegl LMS-Q1560 dual channel laser scanner lidar system . The data was delivered in the UTM coordinate system, meters, zone 17, horizontal datum NAD83 (2011), vertical datum NAVD88, Geoid 12B. Deliverables for the project included a raw (unclassified) calibrated lidar point cloud, survey control, and a final acquisition/calibration report. The calibration process considered all errors inherent with the equipment including errors in GPS, IMU, and sensor specific parameters. Adjustments were made to achieve a flight line to flight line data match (relative calibration) and subsequently adjusted to control for absolute accuracy. Process steps to achieve this are as follows: Rigorous lidar calibration: all sources of error such as the sensor's ranging and torsion parameters, atmospheric variables, GPS conditions, and IMU offsets were analyzed and removed to the highest level possible. This method addresses all errors, both vertical and horizontal in nature. Ranging, atmospheric variables, and GPS conditions affect the vertical position of the surface, whereas IMU offsets and torsion parameters affect the data horizontally. The horizontal accuracy is proven through repeatability: when the position of features remains constant no matter what direction the plane was flying and no matter where the feature is positioned within the swath, relative horizontal accuracy is achieved. Absolute horizontal accuracy is achieved through the use of differential GPS with base lines shorter than 25 miles. The base station is set at a temporary monument that is 'tied-in' to the CORS network. The same position is used for every lift, ensuring that any errors in its position will affect all data equally and can therefore be removed equally. Vertical accuracy is achieved through the adjustment to ground control survey points within the finished product. Although the base station has absolute vertical accuracy, adjustments to sensor parameters introduces vertical error that must be normalized in the final (mean) adjustment. The withheld and overlap bits are set and all headers, appropriate point data records, and variable length records, including spatial reference information, are updated in GeoCue software and then verified using proprietary Dewberry tools. |
---|---|
Process Date/Time: | 2017-04-01 00:00:00 |
Process Step 3
Description: |
Dewberry utilizes a variety of software suites for inventory management, classification, and data processing. All lidar related processes begin by importing the data into the GeoCue task management software. The swath data is tiled according to project specifications (1,500 m x 1,500 m). The tiled data is then opened in Terrascan where Dewberry classifies edge of flight line points that may be geometrically unusable with the withheld bit. These points are separated from the main point cloud so that they are not used in the ground algorithms. Overage points are then identified with the overlap bit. Dewberry then uses proprietary ground classification routines to remove any non-ground points and generate an accurate ground surface. The ground routine consists of three main parameters (building size, iteration angle, and iteration distance); by adjusting these parameters and running several iterations of this routine an initial ground surface is developed. The building size parameter sets a roaming window size. Each tile is loaded with neighboring points from adjacent tiles and the routine classifies the data section by section based on this roaming window size. The second most important parameter is the maximum terrain angle, which sets the highest allowed terrain angle within the model. As part of the ground routine, low noise points are classified to class 7 and high noise points are classified to class 18. Once the ground routine has been completed, bridge decks are classified to class 17 using bridge breaklines compiled by Dewberry. A manual quality control routine is then performed using hillshades, cross-sections, and profiles within the Terrasolid software suite. After this QC step, a peer review is performed on all tiles and a supervisor manual inspection is completed on a percentage of the classified tiles based on the project size and variability of the terrain. After the ground classification and bridge deck corrections are completed, the dataset is processed through a water classification routine that utilizes breaklines compiled by Dewberry to automatically classify hydrographic features. The water classification routine selects ground points within the breakline polygons and automatically classifies them as class 9, water. During this water classification routine, points that are within 1x NPS or less of the hydrographic features are moved to class 10, an ignored ground due to breakline proximity. A final QC is performed on the data. All headers, appropriate point data records, and variable length records, including spatial reference information, are updated in GeoCue software and then verified using proprietary Dewberry tools. The data was classified as follows: Class 1 = Unclassified. This class includes vegetation, buildings, noise etc. Class 2 = Ground Class 7= Low Noise Class 9 = Water Class 10 = Ignored Ground due to breakline proximity Class 17 = Bridge Decks Class 18 = High Noise The LAS header information was verified to contain the following: Class (Integer) Adjusted GPS Time (0.0001 seconds) Easting (0.003 m) Northing (0.003 m) Elevation (0.003 m) Echo Number (Integer) Echo (Integer) Intensity (16 bit integer) Flight Line (Integer) Scan Angle (degree) |
---|---|
Process Date/Time: | 2017-01-01 00:00:00 |
Process Step 4
Description: |
Dewberry used GeoCue software to produce intensity imagery and raster stereo models from the source lidar for use in lidargrammetry techniques. Dewberry then produced full point cloud intensity imagery, bare earth ground models, density models, and slope models. These files were ingested into eCognition software, segmented into polygons, and training samples were created to identify water. eCognition used the training samples and defined parameters to identify water segments throughout the project area. Water segments were then reviewed for completeness, separated into project defined feature classes, merged, and smoothed. Elevations derived from a bare earth lidar terrain were applied to each feature for 3D attribution. The delineation of lakes and ponds and tidal waters, or other water bodies at a constant elevation, was achieved using eCognition software. Lidargrammetry was used to monotonically collect streams and rivers, or features that have gradient 3D elevations. All breaklines were collected according to specifications for the project. |
---|
Process Step 5
Description: |
All hydrographic breaklines were collected by Kinetics. Breaklines were compiled for all Lakes and Ponds that were 2 acres or greater using the LiDAR intensity data and a surface terrain model of the entire project area in ESRI's ArcMap 10.5 and GeoCue's LP360 2017.1.54.7. This collection environment allows for the analyst to determine shore lines with a high level of accuracy. After the collection of hydro lines all features were validated for vertical difference, to ensure that Lakes and ponds are at or slightly below the immediately surrounding terrain. Breaklines were compiled for all Rivers and Streams that were greater than 100 ft nominal width using the LiDAR intensity data and a surface terrain model of the entire project area in ESRI's ArcMap 10.5 and GeoCue's LP360 2017.1.54.7. This collection environment allows for the analyst to determine the location of the bank with a high level of accuracy. After the collection of hydro lines all features were validated for monotonicity to ensure that they represent a gradient downhill water surface and vertical difference to ensure that the water surface edge is at or slightly below the immediately surrounding terrain. |
---|
Process Step 6
Description: |
Dewberry digitized 2D bridge deck polygons from the intensity imagery and used these polygons to classify bridge deck points in the LAS to class 17. As some bridges are hard to identify in intensity imagery, Dewberry then used ESRI software to generate bare earth elevation rasters. Bare earth elevation rasters do not contain bridges. As bridges are removed from bare earth DEMs but DEMs are continuous surfaces, the area between bridge abutments must be interpolated. The rasters are reviewed to ensure all locations where the interpolation in a DEM indicates a bridge have been collected in the 2D bridge deck polygons. |
---|
Process Step 7
Description: |
The bridge deck polygons are loaded into Terrascan software. Lidar points and surface models created from ground lidar points are reviewed and 3D bridge breaklines are compiled in Terrascan. Typically, two breaklines are compiled for each bridge deck-one breakline along the ground of each abutment. The bridge breaklines are placed perpendicular to the bridge deck and extend just beyond the extents of the bridge deck. Extending the bridge breaklines beyond the extent of the bridge deck allows the compiler to use ground elevations from the ground lidar data for each endpoint of the breakline. The 3D endpoints of each breakline are used to enforce a continous slope on the ground under the bridge deck along the collected breakline. These breaklines are used in the final DEM production and help to reduce the appearance of bridge saddles. |
---|
Process Step 8
Description: |
Breaklines are reviewed against lidar intensity imagery to verify completeness of capture. All breaklines are then compared to ESRI terrains created from ground only points prior to water classification. The horizontal placement of breaklines is compared to terrain features and the breakline elevations are compared to lidar elevations to ensure all breaklines match the lidar within acceptable tolerances. Some deviation is expected between hydrographic breakline and lidar elevations due to monotonicity, connectivity, and flattening rules that are enforced on the hydrographic breaklines. Once completeness, horizontal placement, and vertical variance is reviewed, all breaklines are reviewed for topological consistency and data integrity using a combination of ESRI Data Reviewer tools and proprietary tools. Corrections are performed within the QC workflow and re-validated. |
---|
Process Step 9
Description: |
Class 2, ground, lidar points are exported from the LAS files into an Arc Geodatabase (GDB) in multipoint format. The 3D breaklines, Inland Lakes and Ponds, Inland Streams and Rivers, and bridge breaklines are imported into the same GDB. An ESRI Terrain is generated from these inputs. The surface type of each input is as follows: Ground Multipoint: Masspoints Inland Lakes and Ponds: Hard Replace Inland Rivers and Streams : Hard Line Bridge Breaklines: Hard Line |
---|
Process Step 10
Description: |
The ESRI Terrain is converted to a raster. The raster is created using linear interpolation with a 1 meter cell size. The DEM is reviewed with hillshades in both ArcGIS and Global Mapper. Hillshades allow the analyst to view the DEMs in 3D and to more efficiently locate and identify potential issues. Analysts review the DEM for missed lidar classification issues, incorrect breakline elevations, incorrect hydro-flattening, and artifacts that are introduced during the raster creation process. |
---|
Process Step 11
Description: |
The corrected and final DEM is clipped to individual tiles. Dewberry uses a proprietary tool that clips the DEM to each tile located within the final Tile Grid, names the clipped DEM to the Tile Grid Cell name, and verifies that final extents are correct. All individual tiles are loaded into Global Mapper for the last review. During this last review, an analyst checks to ensure full, complete coverage, no issues along tile boundaries, tiles seamlessly edge-match, and that there are no remaining processing artifacts in the dataset. |
---|
Process Step 12
Description: |
The NOAA Office for Coastal Management (OCM) created references to the USGS GeoTIFF files that were ingested into the NOAA Digital Coast Data Access Viewer (DAV). No changes were made to the data. The DAV will access the raster data as it resides on Amazon Web Services (AWS). These are the GeoTIFF files that are being accessed: https://prd-tnm.s3.amazonaws.com/index.html?prefix=StagedProducts/Elevation/OPR/Projects/VA_FEMA_R3_SW_Lidar_2016_D16/VA_FEMA_R3_Northeast_2016/TIFF/ https://prd-tnm.s3.amazonaws.com/index.html?prefix=StagedProducts/Elevation/OPR/Projects/VA_FEMA_R3_SW_Lidar_2016_D16/VA_FEMA_R3_Southwest_A_2016/TIFF/ https://prd-tnm.s3.amazonaws.com/index.html?prefix=StagedProducts/Elevation/OPR/Projects/VA_FEMA_R3_SW_Lidar_2016_D16/VA_FEMA_R3_Southwest_B_2016/TIFF/ |
---|---|
Process Date/Time: | 2025-03-03 00:00:00 |
Process Contact: | Office for Coastal Management (OCM) |
Related Items
Item Type | Relationship Type | Title |
---|---|---|
Data Set (DS) | Cross Reference |
2016 - 2017 FEMA Lidar: Southwest Virginia & Northeast West Virginia |
Catalog Details
Catalog Item ID: | 75003 |
---|---|
GUID: | gov.noaa.nmfs.inport:75003 |
Metadata Record Created By: | Rebecca Mataosky |
Metadata Record Created: | 2025-03-03 15:53+0000 |
Metadata Record Last Modified By: | Rebecca Mataosky |
Metadata Record Last Modified: | 2025-03-03 19:16+0000 |
Metadata Record Published: | 2025-03-03 |
Owner Org: | OCMP |
Metadata Publication Status: | Published Externally |
Do Not Publish?: | N |
Metadata Last Review Date: | 2025-02-26 |
Metadata Review Frequency: | 1 Year |
Metadata Next Review Date: | 2026-02-26 |