DMP Template v2.0.1 (2015-01-01)

Please provide the following information, and submit to the NOAA DM Plan Repository.

Reference to Master DM Plan (if applicable)

As stated in Section IV, Requirement 1.3, DM Plans may be hierarchical. If this DM Plan inherits provisions from a higher-level DM Plan already submitted to the Repository, then this more-specific Plan only needs to provide information that differs from what was provided in the Master DM Plan.

URL of higher-level DM Plan (if any) as submitted to DM Plan Repository:
Always left blank

1. General Description of Data to be Managed

1.1. Name of the Data, data collection Project, or data-producing Program:
NOAA Geotiff - 5 meter LiDAR Reflectivity, U.S. Caribbean - Puerto Rico (southwest) - Projects OPR-I305-KRL-06, (2006), UTM 19N NAD83
1.2. Summary description of the data:

This image represents a LiDAR (Light Detection and Ranging) intensity mosaic (mean 5 meter gridded) from the shoreline of southwestern Puerto Rico to about 50 meters in depth. Reflectivity was calculated for each sounding as the ratio of returned energy to transmitted energy, normalized for losses in a single wavelength (green/blue 532nm). The numerical values for the relative reflectivity are scaled logarithmically to an 8-bit integer range 0 - 255The Tenix LADS Corporation (TLI) acquired bathymetric LIDAR for NOAA from 4/07/2006 to 5/15/2006. Data was acquired with a LADS (Laser Airborne Depth Sounder) Mk II Airborne System from altitudes between 1,200 and 2,200ft at ground speeds between 140 and 175 knots. The 900 Hertz Nd: YAG (neodymium-doped yttrium aluminum garnet) laser (1064 nm) acquired 4x4 meter spot spacing and 200% seabed coverage. In total, 265 square nautical miles of LiDAR were collected between -50 m (topographic) and up to 70 m (depth), requiring a total of 102 flight hours (134 hours, including flight time to and from San Juan airport). Environmental factors such as wind strength and direction, cloud cover, and water clarity influenced the area of data acquisition on a daily basis. The data was processed using the LADS Mk II Ground System and data visualization, quality control and final products were created using CARIS HIPS and SIPS 6.1 and CARIS BASE Editor 2.1 The project was conducted to meet the IHO (International Hydrograph Organization) Order 1 accuracy standards, dependant on the project area and depth. All users should individually evaluate the suitability of this data according to their own needs and standards.

Taken From: Item Identification | Abstract
Notes: Only a maximum of 4000 characters will be included.
1.3. Is this a one-time data collection, or an ongoing series of measurements?
One-time data collection
Taken From: Extents / Time Frames | Time Frame Type
Notes: Data collection is considered ongoing if a time frame of type "Continuous" exists.
1.4. Actual or planned temporal coverage of the data:
2006-04-07 to 2006-05-15
Taken From: Extents | Time Frame - Start, Time Frame - End
Notes: All time frames from all extent groups are included.
1.5. Actual or planned geographic coverage of the data:
W: -67.439646, E: -66.93887, N: 18.19272, S: 17.857964
Taken From: Extents | Geographic Area Bounds, Geographic Area Description
Notes: All geographic areas from all extent groups are included.
1.6. Type(s) of data:
(e.g., digital numeric data, imagery, photographs, video, audio, database, tabular data, etc.)
remote-sensing image
1.7. Data collection method(s):
(e.g., satellite, airplane, unmanned aerial system, radar, weather station, moored buoy, research vessel, autonomous underwater vehicle, animal tagging, manual surveys, enforcement activities, numerical model, etc.)
No information found
1.8. If data are from a NOAA Observing System of Record, indicate name of system:
Always left blank due to field exemption
1.8.1. If data are from another observing system, please specify:
Always left blank due to field exemption

2. Point of Contact for this Data Management Plan (author or maintainer)

2.1. Name:
NCCOS Scientific Data Coordinator
Taken From: Support Roles (Metadata Contact) | Person
Notes: The name of the Person of the most recent Support Role of type "Metadata Contact" is used. The support role must be in effect.
2.2. Title:
Metadata Contact
Always listed as "Metadata Contact"
2.3. Affiliation or facility:
Taken From: Support Roles (Metadata Contact) | Organization
Notes: The name of the Organization of the most recent Support Role of type "Metadata Contact" is used. This field is required if applicable.
2.4. E-mail address:
NCCOS.data@noaa.gov
Notes: The email address is taken from the address listed for the Person assigned as the Metadata Contact in Support Roles.
2.5. Phone number:
No information found
Notes: The phone number is taken from the number listed for the Person assigned as the Metadata Contact in Support Roles. If the phone number is missing or incorrect, please contact your Librarian to update the Person record.

3. Responsible Party for Data Management

Program Managers, or their designee, shall be responsible for assuring the proper management of the data produced by their Program. Please indicate the responsible party below.

3.1. Name:
NCCOS Scientific Data Coordinator
Taken From: Support Roles (Data Steward) | Person
Notes: The name of the Person of the most recent Support Role of type "Data Steward" is used. The support role must be in effect.
3.2. Position Title:
Data Steward
Always listed as "Data Steward"

4. Resources

Programs must identify resources within their own budget for managing the data they produce.

4.1. Have resources for management of these data been identified?
No information found
4.2. Approximate percentage of the budget for these data devoted to data management (specify percentage or "unknown"):
No information found

5. Data Lineage and Quality

NOAA has issued Information Quality Guidelines for ensuring and maximizing the quality, objectivity, utility, and integrity of information which it disseminates.

5.1. Processing workflow of the data from collection or acquisition to making it publicly accessible
(describe or provide URL of description):

Process Steps:

  • 2006-01-01 00:00:00 - Data Acquisition:For this project (OPR-I305-KRL-06), the Chief of Party was TLI's Darren Stephenson and Hydrographer was TLI's Mark Sinclair. Data was collected between 4/7/2006 and 5/15/2006 using the LADS Mk II Airborne System. The LADS Mk II Airborne System (AS) consists of a Dash 8-200 series aircraft, which has a transit speed of 250 knots at altitudes of up to 25,000ft and an endurance of up to eight hours. Survey operations are conducted from heights between 1,200 and 2,200ft at ground speeds between 140 and 175 knots. The aircraft was fitted with an Nd: YAG laser, which operates at 900 Hertz from a stabilized platform to provide a number of different spot spacings. The survey area was sounded at 4x4m laser spot spacing with main lines of sounding spaced at 80m, which provided the required 200% coverage.Green laser pulses are scanned beneath the aircraft in a rectilinear pattern. The pulses are reflected from the land, sea surface, within the water column and from the seabed. The height of the aircraft is determined by the infrared laser return, which is supplemented by the inertial height from the Attitude and Heading Reference System and GPS height. Real-time positioning is obtained by an Ashtech GG24 GPS receiver combined with Wide Area DGPS (Differential Global Positioning System) provided by the Fugro Omnistar to provide a differentially corrected position. Ashtech Z12 GPS receivers are also provided as part of the Airborne System and Ground Systems to log KGPS (Kinetic Global Positioning System) data on the aircraft and at a locally established GPS (Global Positioning System) base station. For more details on the airborne system, refer to the DAPR (Data Acquisition and Processing Report). (Citation: OPR-I305-KRL-06 LiDAR Data)
  • 2006-01-01 00:00:00 - Data Processing:The data was processed using the LADS Mk II Ground System. It consists of a portable Compaq Alpha ES40 Series 3 processor server with 1 GB EEC RAM, 764 GB disk space, digital linear tape (DLT) drives and magazines, digital audio tape (DAT) drive, CD ROM drive and is networked to up to 12 Compaq 1.5 GHz PCs and a HP 800ps Design Jet Plotter, printers and QC workstations. The GS supports survey planning, data processing, quality control and data export. The GS component also includes a KGPS base station, which provides independent post-processed position and height data. The LADS ground system includes a reflectivity algorithm in which reflectivity is calculated for each sounding as the ratio of returned energy to transmitted energy, normalized for losses. A comprehensive description of the GS is provided in the Data Acquisition and Processing Report delivered for project number OPR-I305-KRL-06.The reflectance XYZ data was imported into CARIS HIPS and SIPS as Singlebeam data. The reflectance data was treated much the same as ordinary XYZ data (XY horizontal position and Z as reflectance value). The procedure used is as follows:- Modified XYZ file to add timestamp by using the CARIS XYZ File Manipulator utility- Created an import script using the CARIS Generic Data Parser- Imported modified XYZ file into CARIS HIPS and SIPS- Computed Total Propagated Error (TPE) using zero values- Applied tide corrections using a zero value file- Merged TPE and tide correction with data- Created fieldsheet to compute BASE surface of reflectance dataThe XYZ had to be modified to add timestamp to each data point. The XYZ file was divided into smaller files containing a maximum of 1,000,000 points per file. Each modified XYZ file was imported using the CARIS Generic Data Parser, creating an import script to recognize each field attribute. Two scripts were created to import timestamps 1000000 to 9999999 and the other 10000000 to 138000000. Once each XYZ file was imported into CARIS a generic zero tide value was applied to each modified XYZ file followed by a zero TPE value computation. The TPE and tide calculations were then merged with the reflectance data. A single fieldsheet was then created to incorporate six 'mean' BASE surfaces, gridded at a 5m resolution, which covered the entire survey area. Using CARIS BASE Editor, these six BASE surfaces were combined into one surface to produce a final 'mean' reflectance BASE surface. The necessity to divide the area into six initially was purely due to processing limitations. Also, the grid resolution does not change relative to depth, as the laser pulse footprint stays relatively constant regardless of depth and the laser spot spacing is consistent irrespective of aircraft altitude. The 5m grid provides the largest amount of detail that can be supported by the LiDAR data density.
  • 2006-01-01 00:00:00 - Quality Control and Product Creation:CARIS HIPS and SIPS 6.1 and CARIS BASE Editor 2.1 were used for data visualization, quality control and final product creation.Data Gaps - The survey area was sounded at 4x4m laser spot spacing with main lines of sounding spaced at 80m, which provided the required 200% coverage. It should be noted that at 4x4m laser spot spacing, there is a gap of 1 to 1.5m between the illuminated areas of adjacent soundings at the sea surface. There is a possibility that small objects in shallow water along the coastline may fall between consecutive 4x4m soundings and not be detected. There are also some gaps in the data due to turbidity and very shallow water, as well as an intermittent laser problem on the last survey sortie. This has resulted in some along track and cross track anomalies and at the time this satisfied the requirement of the survey. If it were known that these laser dropout areas would affect the quality of the reflectivity data then the lines would have been reflown.Position Checks - Two independent positioning systems were used during the survey. Real-time positions were aided by WADGPS (Wide Area Differential Global Positioning System). A post-processed KGPS position was also determined relative to a local GPS base station that was established on the rooftop of the Courtyard Marriott Hotel in San Juan. The post-processed KGPS position solutions were applied to each sounding during post-processing and the height used in the datum filter.Horizontal Control - Data collection and processing were conducted on the Airborne and Ground Systems in World Geodetic System (WGS84) on Universal Transverse Mercator (Northern Hemisphere) projection UTM (N) in Zone 19, Central Meridian 69 W. All units are in meters. This data was post-processed and all soundings are relative to the North American Datum 1983 (NAD83). For more details, please see the Vertical and Horizontal Control Report.Water Clarity - The water clarity in the survey area was ideal for laser bathymetry as the water was very clear. Coverage was obtained for the majority of the survey area. The only area where coverage was not achieved was due to turbidity or very shallow water. Water depths to 50m were achieved at the extent of the predominant reef structure in SW Puerto Rico. The majority of the survey area is less than 20m deep. There are a number of areas throughout the survey area where no depths were achieved due to turbidity or very shallow water. The water clarity in some areas did vary on a daily basis, which required careful management. Additional survey lines were planned and flown to minimize the data gaps due to turbidity. Significant variations, temporally or spatially in turbidity may impact the reflectivity algorithm.
  • 2007-12-01 00:00:00 - The final images were reprojected from Transverse Mercator to NAD 1983 UTM Zone 19N using ArcGIS. Small holidays (i.e., missing data values) were filled using a nearest neighbor interpolation technique.
5.1.1. If data at different stages of the workflow, or products derived from these data, are subject to a separate data management plan, provide reference to other plan:
Always left blank
5.2. Quality control procedures employed
(describe or provide URL of description):
No information found

6. Data Documentation

The EDMC Data Documentation Procedural Directive requires that NOAA data be well documented, specifies the use of ISO 19115 and related standards for documentation of new data, and provides links to resources and tools for metadata creation and validation.

6.1. Does metadata comply with EDMC Data Documentation directive?
No
Notes: All required DMP fields must be populated and valid to comply with the directive.
6.1.1. If metadata are non-existent or non-compliant, please explain:

Missing/invalid information:

  • 1.7. Data collection method(s)
  • 4.1. Have resources for management of these data been identified?
  • 4.2. Approximate percentage of the budget for these data devoted to data management
  • 5.2. Quality control procedures employed
  • 7.1. Do these data comply with the Data Access directive?
  • 7.1.1. If data are not available or has limitations, has a Waiver been filed?
  • 7.1.2. If there are limitations to data access, describe how data are protected
  • 7.2. Name of organization of facility providing data access
  • 7.2.1. If data hosting service is needed, please indicate
  • 7.3. Data access methods or services offered
  • 7.4. Approximate delay between data collection and dissemination
  • 8.1. Actual or planned long-term data archive location
  • 8.3. Approximate delay between data collection and submission to an archive facility
  • 8.4. How will the data be protected from accidental or malicious modification or deletion prior to receipt by the archive?
Notes: Required DMP fields that are not populated or invalid are listed here.
6.2. Name of organization or facility providing metadata hosting:
NMFS Office of Science and Technology
Always listed as "NMFS Office of Science and Technology"
6.2.1. If service is needed for metadata hosting, please indicate:
Always left blank
6.3. URL of metadata folder or data catalog, if known:
Always listed as the URL to the InPort Data Set record
6.4. Process for producing and maintaining metadata
(describe or provide URL of description):
Metadata produced and maintained in accordance with the NOAA Data Documentation Procedural Directive: https://nosc.noaa.gov/EDMC/DAARWG/docs/EDMC_PD-Data_Documentation_v1.pdf
Always listed with the above statement

7. Data Access

NAO 212-15 states that access to environmental data may only be restricted when distribution is explicitly limited by law, regulation, policy (such as those applicable to personally identifiable information or protected critical infrastructure information or proprietary trade information) or by security requirements. The EDMC Data Access Procedural Directive contains specific guidance, recommends the use of open-standard, interoperable, non-proprietary web services, provides information about resources and tools to enable data access, and includes a Waiver to be submitted to justify any approach other than full, unrestricted public access.

7.1. Do these data comply with the Data Access directive?
No information found
7.1.1. If the data are not to be made available to the public at all, or with limitations, has a Waiver (Appendix A of Data Access directive) been filed?
No information found
7.1.2. If there are limitations to public data access, describe how data are protected from unauthorized access or disclosure:

Please cite any use of this data.

7.2. Name of organization of facility providing data access:
No information found
Taken From: Support Roles (Distributor) | Organization
Notes: The name of the Organization of the most recent Support Role of type "Distributor" is used. The support role must be in effect. This information is not required if an approved access waiver exists for this data.
7.2.1. If data hosting service is needed, please indicate:
No information found
Taken From: Data Management | If data hosting service is needed, please indicate
Notes: This field is required if a Distributor has not been specified.
7.2.2. URL of data access service, if known:
Taken From: Distribution Info | Download URL
Notes: All URLs listed in the Distribution Info section will be included. This field is required if applicable.
7.3. Data access methods or services offered:
No information found
7.4. Approximate delay between data collection and dissemination:
No information found
7.4.1. If delay is longer than latency of automated processing, indicate under what authority data access is delayed:

8. Data Preservation and Protection

The NOAA Procedure for Scientific Records Appraisal and Archive Approval describes how to identify, appraise and decide what scientific records are to be preserved in a NOAA archive.

8.1. Actual or planned long-term data archive location:
(Specify NCEI-MD, NCEI-CO, NCEI-NC, NCEI-MS, World Data Center (WDC) facility, Other, To Be Determined, Unable to Archive, or No Archiving Intended)
No information found
8.1.1. If World Data Center or Other, specify:
Taken From: Data Management | Actual or planned long-term data archive location
Notes: This field is required if archive location is World Data Center or Other.
8.1.2. If To Be Determined, Unable to Archive or No Archiving Intended, explain:
Taken From: Data Management | If To Be Determined, Unable to Archive or No Archiving Intended, explain
Notes: This field is required if archive location is To Be Determined, Unable to Archive, or No Archiving Intended.
8.2. Data storage facility prior to being sent to an archive facility (if any):
National Centers for Coastal Ocean Science - Silver Spring, MD
Taken From: Physical Location | Organization, City, State, Location Description
Notes: Physical Location Organization, City and State are required, or a Location Description is required.
8.3. Approximate delay between data collection and submission to an archive facility:
No information found
8.4. How will the data be protected from accidental or malicious modification or deletion prior to receipt by the archive?
Discuss data back-up, disaster recovery/contingency planning, and off-site data storage relevant to the data collection
No information found

9. Additional Line Office or Staff Office Questions

Line and Staff Offices may extend this template by inserting additional questions in this section.

Always left blank