Arctic Whale Ecology Study April 2016 Quarterly Report
December 06, 2016
The major activities during this quarter consisted of the processing and analysis of data collected during the 2013, 2014, and 2015 cruises, and continuing the analysis and synthesis work necessary for the final report. Although not part of the original ARCWEST plan, there will be a 2016 cruise for the Arctic Long-Term Integrated Mooring Array (ALTIMA) project, supported by funding from NOAA (Stabeno) with supplemental funding from BOEM through ARCWEST. Planning for this cruise has begun; the vessel contract is currently up for solicitation and closing soon. This survey will allow us to retrieve and redeploy the biophysical and acoustic moorings which were turned over in 2015, ensuring continuation of our long time series of data begun in 2010 (with some sites beginning in 2007). The passive acoustics and satellite tagging group has also met Public Access of Research Results (PARR) requirement deadlines, and the oceanographic and zooplankton groups are working to meet these deadlines. Highlights of progress and results to date are listed below by objective, with additional details in the main body of the report.