Unsupported Browser Detected

Internet Explorer lacks support for the features of this website. For the best experience, please use a modern browser such as Chrome, Firefox, or Edge.

2010 Klamath Project Biological Opinion

March 15, 2010

Operation of the Klamath Project between 2010 and 2018

Reclamation proposes to operate the authorized features and facilities of the Klamath Project (Project), to March 31, 2018, to store, divert, and manage flows of the Klamath and Lost Rivers. Project water is stored behind several dams in reservoirs or lakes within the Upper Klamath River Basin. An arrangement of operational rules and an Interactive Management (IM) process is proposed by Reclamation to manage the distribution of stored water and the flows of the Klamath and Lost Rivers.

Last updated by West Coast Regional Office on 09/27/2019