Incidental Take Authorization: U.S. Navy Dry Dock Expansion Project at Portsmouth Naval Shipyard, Kittery, Maine
Summary
NOAA Fisheries has issued a renewal incidental harassment authorization (IHA) to the U.S. Navy (Navy) to take small numbers of marine mammals, by harassment, incidental to Portsmouth Naval Shipyard Dry Dock 1 modification and expansion in Kittery, Maine.
NOAA Fisheries has received a request from the Navy for the re-issuance of a previously issued IHA with the only change being effective dates. The initial IHA authorized take of five species of marine mammals, by Level A and Level B harassment, incidental to construction associated with the Portsmouth Naval Shipyard Dry Dock 1 modification and expansion in Kittery, Maine. The project has been delayed and none of the work covered in the initial IHA has been conducted. The initial IHA was effective from October 1, 2019, through September 30, 2020. The Navy has requested re-issuance with new effective dates of March 1, 2020, through February 28, 2021. The scope of the activities and anticipated effects remain the same, authorized take numbers are not changed, and the required mitigation, monitoring, and reporting remains the same as included in the initial IHA. NOAA Fisheries is, therefore, issuing a second IHA to cover the incidental take analyzed and authorized in the initial IHA.
Federal Register
Supporting Materials
- Renewal IHA (pdf, 7 pages)
- Reissued 2019 IHA (pdf, 8 pages)
- 2019 Issued IHA (pdf, 8 pages)
- IHA Application (pdf, 183 pages)
- IHA Renewal Request (pdf, 4 pages)
- References Cited (pdf, 4 pages)
- Public Comments (pdf, 5 pages)
- Public Comments, 2021 Renewal (pdf, 5 pages)
- 2018 Monitoring Report (pdf, 19 pages)
- 2019 Monitoring Report (pdf, 41 pages)
- 2019 Monitoring Report Appendices (pdf, 95 pages)
- 2021 Monitoring Report (pdf, 567 pages)