Incidental Take Authorization: U.S. Navy Dry Dock Expansion Project at Portsmouth Naval Shipyard, Kittery, Maine

Overview

Authority
Marine Mammal Protection Act
Action Status
Notice
Published
03/17/2021

Summary

NOAA Fisheries has issued a renewal incidental harassment authorization (IHA) to the U.S. Navy (Navy) to take small numbers of marine mammals, by harassment, incidental to Portsmouth Naval Shipyard Dry Dock 1 modification and expansion in Kittery, Maine.

NOAA Fisheries has received a request from the Navy for the re-issuance of a previously issued IHA with the only change being effective dates. The initial IHA authorized take of five species of marine mammals, by Level A and Level B harassment, incidental to construction associated with the Portsmouth Naval Shipyard Dry Dock 1 modification and expansion in Kittery, Maine. The project has been delayed and none of the work covered in the initial IHA has been conducted. The initial IHA was effective from October 1, 2019, through September 30, 2020. The Navy has requested re-issuance with new effective dates of March 1, 2020, through February 28, 2021. The scope of the activities and anticipated effects remain the same, authorized take numbers are not changed, and the required mitigation, monitoring, and reporting remains the same as included in the initial IHA. NOAA Fisheries is, therefore, issuing a second IHA to cover the incidental take analyzed and authorized in the initial IHA.

Project Location Map

Project Location

Conceptual Drawing of Site

Conceptual drawing of site

Last updated by Office of Protected Resources on 01/31/2023