All Protected Resources Regulations & Actions
Incidental Take Authorization: U.S. Air Force Testing of Extended Range Cannon Artillery II at Vandenberg Air Force Base, California
Incidental Take Authorization: U.S. Air Force Testing of Extended Range Cannon Artillery II at Vandenberg Air Force Base, California
Effective
10/01/2023
Incidental Take Authorization: Army Corps of Engineers Sand Island Pile Dikes Repairs in the Columbia River
Incidental Take Authorization: Army Corps of Engineers Sand Island Pile Dikes Repairs in the Columbia River
Effective
08/01/2023
Incidental Take Authorization: U.S. Navy Training Activities in the Gulf of Alaska Study Area
Incidental Take Authorization: U.S. Navy Training Activities in the Gulf of Alaska Study Area
Effective
02/03/2023
Incidental Take Authorization: U.S. Navy Fuel Pier Removal at Naval Base San Diego, California
NOAA Fisheries has received a request from the United States Navy (Navy) for authorization to take marine mammals incidental to the Fuel Pier Inboard Pile Removal Project at Naval Base Point Loma in San Diego Bay, California.
Effective
01/15/2023
Incidental Take Authorization: U.S. Army Corps of Engineers Tillamook South Jetty Repairs in Tillamook Bay, Oregon
Incidental Take Authorization: U.S. Army Corps of Engineers Tillamook South Jetty Repairs in Tillamook Bay, Oregon
Effective
11/01/2022
Incidental Take Authorization: U.S. Army Corps of Engineers North Jetty Maintenance and Repairs Project, Coos Bay, Oregon
NOAA Fisheries has issued incidental harassment authorizations (IHAs) to the U.S. Army Corps of Engineers (USACE) to incidentally harass, by Level B harassment only, marine mammals during pile driving and removal activities over two years associated with the Coos Bay North Jetty maintenance and repairs project.
Effective
09/01/2022
Incidental Take Authorization: Washington Department of Transportation Bainbridge Island Ferry Terminal Overhead Loading Replacement Project and Eagle
Incidental Take Authorization: Washington Department of Transportation Bainbridge Island Ferry Terminal Overhead Loading Replacement Project and Eagle Harbor Maintenance Facility Slip F Improvement Project
Published
08/10/2022
Incidental Take Authorization: Lamont-Doherty Earth Observatory Geophysical Surveys at the Cascadia Subduction Zone and Juan de Fuca Plate in the
Incidental Take Authorization: Lamont-Doherty Earth Observatory Geophysical Surveys at the Cascadia Subduction Zone and Juan de Fuca Plate in the Northeast Pacific Ocean
Effective
08/01/2022
Incidental Take Authorization: City of Seattle Pier 58 Reconstruction Project, Seattle, WA
Incidental Take Authorization: City of Seattle Pier 58 Reconstruction Project, Seattle, WA
Effective
08/01/2022
Incidental Take Authorization: City of Seattle Pier 63 Removal Project, Seattle, WA
Incidental Take Authorization: City of Seattle Pier 63 Removal Project, Seattle, WA
Effective
08/01/2022