Section 7: Biological Opinions in the Greater Atlantic Region
A list of the active and archived Section 7 Biological Options in the Greater Atlantic Region.
About Active and Archived Biological Opinions
An "active" Biological Opinion is currently in effect - typically an action that is ongoing or expected to begin soon. An "archived" Biological Opinion is for an action that has been completed, is no longer planned, or for an ongoing project, has been replaced by a Biological Opinion in the "active" list. A list of these biological opinions can be found below.
Environmental Consultation Organizer (ECO) System

Access the Environmental Consultation Organizer (ECO) system
How to Locate a Consultation
Active Biological Opinions (including fisheries and non-fisheries actions) can be found in the NOAA Repository by typing in the ECO number (i.e., GARFO-2019-12345) or by clicking on the links below. Alternatively, you can search for the consultation on doi.org, by typing in the DOI number. You can retrieve the DOI or ECO number by searching for the project in ECO.
Note: If you are unable to locate an individual consultation or related documents in ECO or the NOAA Repository, please send an email to NMFS.Historic.Consultations@noaa.gov.
Index of Active Biological Opinions
| Lead Action Agency | Protected Resources Division Team Lead | Project Title | ECO / PCTS Reference Number | DOI Number / Repository Link | Signature Date | Status |
|---|---|---|---|---|---|---|
| NOAA Fisheries | ESA Fish, Ecosystems, and Energy | Cherryfield Ice Dam Fish Passage Project on the Narraguagus River, Cherryfield, Maine | GARFO-2026-00007 | 10.25923/crrf-rp17 | 5/29/2026 | Active |
| ESA Fish, Ecosystems, and Energy | Greater Atlantic Region, Protected Resources Division, proposal to modify and re- issue Permit no. 21516-01 for Atlantic sturgeon affected by Dominion’s operation of the Chesterfield Power Station, Virginia | GARFO-2025-02286 | 8/6/2025 | Active | ||
| ESA Fish, Ecosystems, and Energy | NMFS Office of Protected Resource’s proposed issuance of an Endangered Species Act Section 10(a)(l)(B) Incidental Take Permit to the University of Massachusetts Dartmouth School for Marine Science and Technology and approval of an associated Habitat Conservation Plan | GARFO-2024-03413 | 7/28/2025 | Active | ||
| Section 7 | Reinitiation - Fisheries and Ecosystem Research to be Conducted and Funded by the Northeast Fisheries Science Center and a Letter of Authorization under the Marine Mammal Protection Act for the Incidental Take of Marine Mammals Pursuant to those Research Activities from 2021-2026 | GARFO-2023-00351 | 10.25923/kw2x-pf42 | 6/15/2023 | Active | |
| Section 7 | ESA Section 7 Consultation on the Atlantic Sea Scallop Fishery Management Plan | GARFO-2020-00437 | 10.25923/2za1-fk82 | 6/17/2021 | Active | |
| Section 7 | Authorization of ten fisheries as authorized by NMFS; the Implementation of Omnibus EFH Amendment 2 | GARFO-2017-00031 |
| 5/27/2021 | Active | |
| Section 7 | ESA Section 7 Consultation on NMFS Gear Regulations in the Virginia Pound Net Fishery | GARFO-2017-01032 / NER-2017-14025 | 10.25923/5zs1-1f35 | 3/31/2018 | Active | |
| USACE | Section 7 | Paulsboro Marine Terminal Roll-on/Roll-off Berth Reinitiation (NAP-2007-1125-39) | GARFO-2023-00860 | 10.25923/fjnx-nr32 | 11/7/2023 | Active |
| Section 7 | Edgemoor Container Port (NAP-2019-278-23) | GARFO-2022-03516 | 10.25923/b7zk-aa69 | 6/2/2023 | Active | |
| Section 7 | New Jersey Wind Port (NAP-2019-01084-39) | GARFO-2021-02227 | 10.25923/j8gz-g091 | 2/25/2022 | Active | |
| Section 7 | New York and New Jersey Harbor Deepening Channel Improvements (HDCI) Navigation Study | GARFO-2020-03300 | 10.25923/4n27-ra70 | 1/26/2022 | Active | |
| Section 7 | New York Coastal Storm Risk Management - Beach Nourishment Projects Utilizing the New York Offshore Borrow Areas: Long Beach, Fire Island to Moriches Inlet, East Rockaway, Fire Island to Montauk Point, New York | GARFO-2018-01302 | 10.25923/gccr-d922 | 09/03/2020 | Active | |
| Section 7 | Reinitiation of Formal Consultation for 10-Years of Maintenance Dredging at Bath Iron Works in Bath, Maine (2020-2029) (NAE-2019-01461) | GARFO-2020-00205 | 10.25923/cmk4-8875 | 09/02/2020 | Active | |
| Section 7 | 5th Season Deepening and Maintenance of the Delaware River Federal Navigation Channel | GARFO-2019-01942 | 10.25923/49h0-c696 | 11/22/2019 | Active | |
| Section 7 | James River FNP: Maintenance Dredging and Disposal | GARFO-2018-00105 / NER-2018-15090 | 10.25923/p872-0r68 | 3/22/2019 | Active | |
| Section 7 | Norfolk Harbor Channels/Craney Island Eastward Expansion | GARFO-2018-00353 / NER-2018-14816 | 10.25923/0xqr-eq76 | 10/5/2018 | Active | |
| Section 7 | DRP Gibbstown Terminal and Logistic Center | GARFO-2017-00176 / NER-2017-14371 | 10.25923/zenx-1x68 | 12/8/2017 | Active | |
| ESA Fish, Ecosystems, and Energy | Calf Island Atlantic Salmon Aquaculture Net Pen Site | GARFO-2016-00324 / NER-2016-13205 | 10.25923/wwhc-w898 | 7/14/2016 | Active | |
| Section 7 | USACE Philadelphia, New Jersey and Delaware Beach Nourishment Program | GARFO-2014-00018 / NER-2014-10904 | GARFO-2014-00018 | 6/26/2014 | Active | |
| Section 7 | Beach Nourishment Projects Utilizing the Sea Bright Offshore Borrow Area: Union Beach, Port Monmouth, and Elberon to Loch Arbour, New Jersey | GARFO-2013-00017 / NER-2014-10606 | GARFO-2013-00017 | 3/7/2014 | Active | |
| ESA Fish, Ecosystems, and Energy | ACOE NAE Phoenix Salmon - Black Island South Netpen Aquaculture | GARFO-2011-00009 / NER-2011-1597 | GARFO-2011-00009 | 6/10/2011 | Active | |
| Section 7 | ACE NAB Atlantic Coast of Maryland Shoreline Protection Project | GARFO-2006-00002 / NER-2006-3915 | GARFO-2006-00002 | 11/30/2006 | Active | |
| ESA Fish, Ecosystems, and Energy | USACOE Permitting Atlantic Salmon Aquaculture in Maine | GARFO-2002-00001 / NER-2002-932 | GARFO-2002-00001 | 11/19/2003 | Active | |
| BOEM | ESA Fish, Ecosystems, and Energy | Construction, Operation, Maintenance, and Decommissioning of the SouthCoast Wind Offshore Energy Project (Lease OCS-A 0521) | GARFO-2024-01317 | 10.25923/r8wr-9156 | 11/7/2024 | Active |
| ESA Fish, Ecosystems, and Energy | Construction, Operation, Maintenance, and Decommissioning of the Vineyard Wind 1 Offshore Energy Project (Lease OCS-A 0501) – Reinitiation | GARFO-2024-01318 | 10.25923/asr1-0357 | 8/23/2024 | Active | |
| ESA Fish, Ecosystems, and Energy | Construction, Operation, Maintenance, and Decommissioning of the Maryland Wind Offshore Energy Project (Lease OCS-A 0490) | GARFO-2024-00070 | 10.25923/49f3-n596 | 6/18/2024 | Active | |
| ESA Fish, Ecosystems, and Energy | Construction, Operation, Maintenance, and Decommissioning of the Revolution Wind Offshore Energy Project (Lease OCS-A 0486) – Reinitiation | GARFO-2024-00419 | 10.25923/mtar-gz11 | 4/30/2024 | Active | |
| ESA Fish, Ecosystems, and Energy | Construction, Operation, Maintenance, and Decommissioning of the New England Wind Offshore Energy Project (Lease OCS-A 0534) | GARFO-2022-03608 | 10.25923/ha2n-9615 | 2/16/2024 | Active | |
| ESA Fish, Ecosystems, and Energy | Construction, Operation, Maintenance, and Decommissioning of the Atlantic Shores South Offshore Energy Project (Lease OCS-A 0499) | GARFO-2023-01804 | 10.25923/k02w-s950 | 12/18/2023 | Active | |
| ESA Fish, Ecosystems, and Energy | Construction, Operation, Maintenance, and Decommissioning of the Sunrise Wind Offshore Energy Project (Lease OCS-A 0487) | GARFO-2023-00534 | 10.25923/zv6x-3180 | 9/28/2023 | Active | |
| ESA Fish, Ecosystems, and Energy | Construction, Operation, Maintenance, and Decommissioning of the Coastal Virginia Offshore Wind Commercial Project (Lease OCS-A 0483) | OPR-2023-02218 | 10.25923/q2sy-9a64 | 9/18/2023 | Active | |
| ESA Fish, Ecosystems, and Energy | Construction, Operation, Maintenance, and Decommissioning of the Empire Wind Offshore Energy Project (Lease OCS-A 0512) and the Connected Action at South Brooklyn Marine Terminal | GARFO-2023-00454 | 10.25923/nbdq-pj74 | 9/8/2023 | Active | |
| ESA Fish, Ecosystems, and Energy | Construction, Operation, Maintenance, and Decommissioning of the Ocean Wind 1 Offshore Energy Project (Lease OCS-A 0498) | GARFO-2022-02397 | 10.25923/6mma-pz36 | 4/3/2023 | Active | |
| ESA Fish, Ecosystems, and Energy | BOEM South Fork Wind project construction, operations, decommissioning, offshore RI and MA | GARFO-2021-00353 | 10.25923/2s78-ba81 | 10/1/2021 | Active | |
| ESA Fish, Ecosystems, and Energy | BOEM Virginia Offshore Wind Technology Advancement Project/Coastal Virginia Offshore Wind Project | GARFO-2015-00030 / NER-2015-12128 | 10.25923/9ch8-qn03 | 3/16/2016 | Active | |
| DOE | ESA Fish, Ecosystems, and Energy | Proposed funding to the Coonamessett Farm Foundation to carry out the proposed project “Surveying Commercial Fish Species and Habitat in Wind Farm Areas Using a Suite of Non-Lethal Methods.” (Award # DE-EE0009799) | GARFO-2023-03431 | 3/29/2024 | Active | |
| EPA | Section 7 | EPA Chesapeake Bay Specific Water Quality Standards and Bay TMDL | GARFO-2010-00005 / NER-2010-5732 | GARFO-2010-00005 | 1/30/2012 | Active |
| FERC | ESA Fish, Ecosystems, and Energy | Continued Operation of the Milford Project (P-2534), with a modified Species Protection Plan | GARFO-2025-01713 | 10.25923/vw17-qk97 | 2/13/2026 | Active |
| ESA Fish, Ecosystems, and Energy | Issuance of new licenses for the Turner Falls (P-1889) and Northfield Mountain Projects (P-2485) | GARFO-2025-02114 | 10.25923/m9hn-na85 | 2/11/2026 | Active | |
| ESA Fish, Ecosystems, and Energy | Proposed amendment of the license for the Benton Falls (FERC No. 5073) Hydro Project | GARFO-2022-03605 | 10.25923/a4hj-q730 | 10/6/2023 | Active | |
| ESA Fish, Ecosystems, and Energy | Issuance of a new license at the Shawmut (FERC # 2322) Hydro Project; Amendments of the licenses at the Lockwood (2574), Hydro-Kennebec (2611), Shawmut, and Weston (2325) Hydro Projects | GARFO-2021-03216 | 10.25923/0cee-za20 | 3/20/2023 | Active | |
| ESA Fish, Ecosystems, and Energy | Proposed amendment of the license for the Brunswick (FERC No. 2284) and Lewiston Falls (FERC No. 2302) Hydro Projects | GARFO-2020-02015 | 10.25923/8075-1d64 | 12/28/2021 | Active | |
| ESA Fish, Ecosystems, and Energy | Proposed Relicensing of the Mattaceunk Project (P-2520) | GARFO-2019-00310 | 10.25923/a9n8-c913 | 8/6/2020 | Active | |
| ESA Fish, Ecosystems, and Energy | Issuance of a new license to the Ellsworth Hydroelectric Project | GARFO-2019-02030 | 10.25923/7fba-a503 | 2/27/2020 | Active | |
| ESA Fish, Ecosystems, and Energy | Continued Operation of the Holyoke Hydroelectric Project (FERC P-2004) - Reinitiation | GARFO-2018-00363 | 10.25923/0vve-5j14 | 12/4/2019 | Active | |
| ESA Fish, Ecosystems, and Energy | Barker's Mills Relicensing (FERC No. 2808) | GARFO-2019-00363 | 8/12/2019 | Active | ||
| ESA Fish, Ecosystems, and Energy | Worumbo Hydro Species Protection Plan | GARFO-2016-00327 / NER-2016-13814 | 10.25923/hdj7-jr41 | 4/3/2017 | Active | |
| ESA Fish, Ecosystems, and Energy | Black Bear Hydro Power-Penobscot SPP and New Powerhouses at the Stillwater and Orono Projects | GARFO-2012-00012 / NER-2012-1568 | GARFO-2012-00012 | 8/31/2012 | Active | |
| ESA Fish, Ecosystems, and Energy | FERC Green Island Power Authority Green Island Hydro Project Relicensing Hudson River | GARFO-2010-00009 / NER-2010-4745 | GARFO-2010-00009 | 9/12/2011 | Active | |
| FHWA | ESA Fish, Ecosystems, and Energy | In-kind Replacement of the Machias Dike Bridge (Rt. 1, Machias, Maine) | GARFO-2023-02387 | 10.25923/c0mx-1q73 | 5/5/2024 | Active |
| Section 7 | Frank J. Wood Bridge Replacement | GARFO-2017-01420 / NER-2017-14574 | 10.25923/tdqj-5679 | 3/30/2018 | Active | |
| MARAD | Section 7 | Port of Salem | GARFO-2024-02358 | 10.25923/h1q2-2908 | 2/2/2026 | Active |
| Section 7 | Arthur Kill Terminal | GARFO-2023-03146 | 10.25923/a3j2-6d40 | 10/21/2024 | Active | |
| Section 7 | Grants for Improvements to the Richmond Marine Terminal and Container Barge | GARFO-2024-01638 | 10.25923/n1sp-j920 | 9/11/2024 | Active | |
| Section 7 | Neptune LNG Reinitiation - ITS | GARFO-2010-00006 / NER-2010-1455 | See "Supporting Files" | 10/7/2016 | Active | |
| ESA Fish, Ecosystems, and Energy | Northeast Gateway Liquefied Natural Gas Port and Algonquin Pipeline Lateral in Massachusetts Bay | GARFO-2013-00016 / NER-2013-10537 | GARFO-2013-00016 | 11/21/2014 | Active | |
| Section 7 | Neptune LNG Reinitiation | GARFO-2010-00006 / NER-2010-1455 | GARFO-2010-00006 | 7/12/2010 | Active | |
| Navy | Section 7 | US Navy Maintenance Dredging of the Kennebec River FNP, Bath ME | GARFO-2019-01719 | 10.25923/b13r-et42 | 10/25/2019 | Active |
| NASA | Section 7 | NASA - Reinitiation of Wallops Island SRIPP | GARFO-2012-00028 / NER-2012-1118 | GARFO-2012-00028 | 8/3/2012 | Active |
| NRC | ESA Fish, Ecosystems, and Energy | Continued Operation of Salem and Hope Creek Nuclear Generating Stations | GARFO-2020-02482 | 10.25923/4tyf-aj61 | 3/24/2023 | Active |
| ESA Fish, Ecosystems, and Energy | Oyster Creek Nuclear Generating Facility Shutdown and Decomissioning (reinitiation) | GARFO-2019-01287 | 10.25923/r5bj-7t87 | 5/29/2020 | Active | |
| ESA Fish, Ecosystems, and Energy | NRC Energy Indian Point Nuclear Power Plant Reinitiation | GARFO-2012-00029 / NER-2012-2252 | GARFO-2012-00029 | 1/30/2013 | Active | |
| ESA Fish, Ecosystems, and Energy | NERO Restoration Center: Reinitiation of Formal Consultation for PRRP | GARFO-2012-00025 / NER-2012-918 | GARFO-2012-00025 | 11/29/2012 | Active | |
| U.S. FWS | Section 7 | U.S. FWS Wildlife and Sport Fish Restoration Program grants 2023-2027 | GARFO-2023-00492 | 10.25923/p793-4787 | 9/14/2023 | Active |
| USGS | Section 7 | USGS Fisheries Telemetry in East Coast Rivers: Scientific Collections for Telemetry, Locomotion and Fish Passage Studies across species | GARFO-2023-02734 | 3/6/2024 | Active |
Index of Archived Biological Opinions
| Lead Action Agency | Project Title | ECO / PCTS Reference Number | DOI Number / Repository Link | Signature Date | Status |
|---|---|---|---|---|---|
| NOAA Fisheries | Fisheries and Ecosystem Research to be Conducted and Funded by the Northeast Fisheries Science Center and the Issuance of a Letter of Authorization under the Marine Mammal Protection Act for the Incidental Take of Marine Mammals Pursuant to those Research Activities from 2021-2026 | GARFO-2021-01039 | 10.25923/17jb-7k88 | 10/8/2021 | Archived |
| ESA Section 7 Consultation on the Atlantic Sea Scallop Fishery Management Plan - 2018 Amended ITS | GARFO-2012-00007 / NER-2012-1461 | GARFO-2012-00007 See "Supporting Files" | 11/27/2018 | Archived | |
| Removal of Coopers Mill Dam on the Sheepscot River Whitefield, Maine | GARFO-2018-02170 / NER-2018-14772 | 10.25923/ebnk-z593v | 6/29/2018 | Archived | |
| ESA Section 7 Consultation on the Continued Prosecution of Fisheries and Ecosystem Research Conducted and Funded by the NEFSC and the letter of Authorization for the Incidental Take of Marine Mammals - ITS Amendment | GARFO-2015-00029 / NER-2015-12532 | See "Supporting Files" | 1/9/2017 | Archived | |
| ESA Section 7 Consultation on the Continued Prosecution of Fisheries and Ecosystem Research Conducted and Funded by the NEFSC and the letter of Authorization for the Incidental Take of Marine Mammals | GARFO-2015-00029 / NER-2015-12532 | 10.25923/d9as-r602 | 6/23/2016 | Archived | |
| Batched Biological Opinion for Seven New England FMPs - 2016 Amended ITS | GARFO-2012-00006 / NER-2012-01956 | GARFO-2012-00006 See "Supporting Files" | 3/10/2016 | Archived | |
| ESA Section 7 Consultation on the American Lobster Fishery | GARFO-2014-00013 / NER-2014-11076 | 10.25923/j5br-9e87 | 7/31/2014 | Archived | |
| Batched Biological Opinion for Seven New England FMPs | GARFO-2012-00006 / NER-2012-01956 | GARFO-2012-00006 | 12/16/2013 | 5/28/2013 | |
| Endangered Species Act Section 7 Consultation on Two Research Projects to be Administered by the Northeast Fisheries Science Center in 2013: (1) the Northeast Area Monitoring and Assessment Program (NEAMAP) Near Shore Trawl Surveys, and (2) a Study Assessing Sea Turtle/Sturgeon Exclusion and Target Catch Retention in a Mid-Atlantic Gillnet Fishery | GARFO-2013-00021 / NER-2013-9677 | GARFO-2013-00021 | 5/28/2013 | 5/28/2013 | |
| ESA Section 7 Consultation on the NEFSC Research Vessel Survey as well as Two Cooperative Gear Research Studies to be overseen by the NEFSC Protected Species Branch | GARFO-2012-00015 / NER-2012-9241 | GARFO-2012-00015 | 11/30/2012 | Archived | |
| ESA Section 7 Consultation on the Continued Implementation of Management Measures for the American Lobster Fishery | GARFO-2012-00009 / NER-2012-1456 | GARFO-2012-00009 | 8/3/2012 | Archived | |
| ESA Section 7 Consultation on the Atlantic Sea Scallop Fishery Management Plan | GARFO-2012-00007 / NER-2012-1461 | GARFO-2012-00007 | 7/12/2012 | Archived | |
| NMFS NEFSC 16 Surveys To Be Carried Out in 2012 | GARFO-2012-00017 / NER-2012-1792 | GARFO-2012-00017 | 6/13/2012 | Archived | |
| NEFSC Penobscot River Estuary Studies | GARFO-2011-00011 / NER-2011-6273 | GARFO-2011-00011 | 4/25/2012 | Archived | |
| Reinitiation of NMFS Funding of 2012 NEAMAP Surveys Carried Out by VIMS | GARFO-2012-00016 / NER-2012-1152 | GARFO-2012-00016 | 4/13/2012 | Archived | |
| ESA Section 7 Consultation on the Atlantic Bluefish Fishery Management Plan | GARFO-2007-00004 / NER-2007-9036 | GARFO-2007-00004 | 10/29/2010 | Archived | |
| Authorization of the Fisheries Under the Spiny Dogfish FMP | GARFO-2008-00002 / NER-2008-1757 | GARFO-2008-00002 | 10/29/2010 | Archived | |
| Authorization of Fisheries Under the Monkfish FMP | GARFO-2008-00001 / NER-2008-1754 | GARFO-2008-00001 | 10/29/2010 | Archived | |
| Authorization of Fisheries Under the Northeast Multispecies FMP | GARFO-2008-00004 / NER-2008-1755 | GARFO-2008-00004 | 10/29/2010 | Archived | |
| Reinitiation of Atlantic Mackerel, Squid and Butterfish FMP | GARFO-2008-00005 / NER-2008-9091 | GARFO-2008-00005 | 10/29/2010 | Archived | |
| Reinitiation of Summer Flounder, Scup and Black Sea Bass | GARFO-2002-00004 / NER-2002-1879 | GARFO-2002-00004 | 10/29/2010 | Archived | |
| ESA Section 7 Consultation on the Northeast Skate Complex FMP | GARFO-2008-00006 / NER-2008-1756 | GARFO-2008-00006 | 10/29/2010 | Archived | |
| Proposed Award of Research Set-Aside for the 2010 to 2012 Surveys of the NEAMAP Near Shore Trawl Program | GARFO-2009-00002 / NER-2009-7486 | GARFO-2009-00002 | 4/13/2010 | Archived | |
| Proposed Award of Research Set-Aside for the Spring and Fall 2009 Surveys of the NEAMAP Near Shore Trawl Program | GARFO-2008-00007 / NER-2008-8795 | GARFO-2008-00007 | 4/16/2009 | Archived | |
| ESA Section 7 Consultation on the Continued Implementation of the Atlantic Sea Scallop FMP (amended) | GARFO-2007-00002 / NER-2007-973 | GARFO-2007-00002 | 2/5/2009 | Archived | |
| NEFSC Penobscot River Fisheries Sampling | GARFO-2008-00008 / NER-2008-4730 | GARFO-2008-00008 | 9/4/2008 | Archived | |
| ESA Section 7 Consultation on the Continued Implementation of the Atlantic Sea Scallop FMP | GARFO-2007-00002 / NER-2007-973 | See "Supporting Files" | 3/14/2008 | Archived | |
| ESA Section 7 Consultation on NOAA-NMFS Northeast Fisheries Science Center Research Activities on Fishing Vessels Albatross IV, Delaware II, Gloria Michelle, Hugh B. Sharp, and the Henry B. Bigelow (January 1, 2007 - December 31, 2009) | GARFO-2007-00003 / NER-2007-1541 | GARFO-2007-00003 | 8/20/2007 | Archived | |
| Sea Turtle Conservation Measures for the Pound Net Fishery in Virginia Waters of the Chesapeake Bay | GARFO-2003-00003 / NER-2003-1596 | GARFO-2003-00003 | 4/16/2004 | Archived | |
| ESA Section 7 Consultation for the Northeast Skate Complex FMP | GARFO-2003-00002 / NER-2003-751 | GARFO-2003-00002 | 7/24/2003 | Archived | |
| Authorization of Fisheries Under the Monkfish FMP | GARFO-2003-00001 / NER-2003-196 | GARFO-2003-00001 | 4/14/2003 | Archived | |
| Reinitiation of Consultation on the Federal Lobster Management Plan in the EEZ for Implementation of Historical Participation | GARFO-2001-00001 / NER-2001-1263 | GARFO-2001-00001 | 10/31/2002 | Archived | |
| ESA Section 7 Consultation on NMFS' Approval of the Tilefish Fishery Management Plan | FPR-2000-1031 | 4/1/2002 | Archived | ||
| ESA Section 7 Consultation on Implementation of the Deep-Sea Red Crab, Chaceon quinquedens, Fishery Management Plan | GARFO-2001-00002 / NER-2001-1245 | GARFO-2001-00002 | 2/6/2002 | Archived | |
| 2002 Specifications for Summer Flounder, Scup and Black Sea Bass | GARFO-2001-00004 / NER-2001-1206 | GARFO-2001-00004 | 12/16/2001 | Archived | |
| Authorization of the Fisheries Under the Spiny Dogfish FMP | GARFO-2000-00001 / NER-2001-544 | GARFO-2000-00001 | 6/14/2001 | Archived | |
| Authorization of Fisheries Under the Northeast Multispecies FMP | GARFO-2000-00002 / NER-2001-330 | GARFO-2000-00002 | 6/14/2001 | Archived | |
| Tilefish Fishery Management Plan | GARFO-2001-00003 / NER-2001-2999 | GARFO-2001-00003 | 3/13/2001 | Archived | |
| Consultation Regarding the FMP for the Atlantic Mackerel, Squid and Atlantic Butterfish Fishery and Amendment 8 to the FMP | GARFO-1999-00001 / NER-2000-417 | GARFO-1999-00001 | 4/28/1999 | Archived | |
| Federal American Lobster Fishery Management Plan | GARFO-1998-00001 | GARFO-1998-00001 | 12/17/1998 | Archived | |
| ESA Section 7 Consultation on Implementation of the Atlantic Large Whale Take Reduction Plan | GARFO-1997-00001 / FPR-1997-51 | GARFO-1997-00001 | 7/15/1997 | Archived | |
| American Lobster Fishery Management Plan | GARFO-1996-00001 | GARFO-1996-00001 | 12/13/1996 | Archived | |
| USACE | Paulsboro Marine Terminal (NAP-2007-1125-39) | GARFO-2022-00012 | 10.25923/efjs-hw65 | 7/19/2022 | Archived |
| Edgemoor Container Port (NAP-2019-278-23) | GARFO-2021-03472 | 10.25923/2nsn-g315 | 3/30/2022 | Archived | |
| 4th Season Deepening and Maintenance of the Delaware River Federal Navigation Channel | GARFO-2018-00242 / NER-2018-15005 | 10.25923/ngb9-p549 | 12/10/2018 | Archived | |
| Deepening and Maintenance of the Delaware River Federal Navigation Channel | GARFO-2016-00340 / NER-2016-13823 | 10.25923/yt80-4828 | 11/17/2017 | Archived | |
| Third Reinitiation of ACOE NAP - Delaware River Main Channel Deepening Reinitiation | GARFO-2015-00056 / NER-2015-12624 | 10.25923/wn2q-aw76 | 11/20/2015 | Archived | |
| Reinitiation of ACOE Deepwater Wind - Block Island Wind Farm - Incidental Take Statement | GARFO-2015-00031 / NER-2015-12248 | See "Supporting Files" | 7/7/2015 | Archived | |
| Reinitiation of ACOE Deepwater Wind - Block Island Wind Farm | GARFO-2015-00031 / NER-2015-12248 | 0.25923/n3g3-gs04 | 6/5/2015 | Archived | |
| Deepwater Wind with Amended ITS | GARFO-2013-00026 / NER-2013-9995 | See "Supporting Files" | 10/30/2014 | Archived | |
| Second Reinitiation of ACOE NAP - Delaware River Main Channel Deepening Reinitiation | GARFO-2013-00019 / NER-2013-10520 | GARFO-2013-00019 | 1/31/2014 | Archived | |
| ACOE Deepwater Wind - Block Island Wind Farm | GARFO-2013-00026/ NER-2013-9995 | GARFO-2013-00026 | 1/29/2014 | Archived | |
| USACE NAP Maintenance of 40' Philadelphia to the Sea Delaware River FNP | GARFO-2013-00020 / NER-2013-9804 | GARFO-2013-00020 | 8/1/2013 | Archived | |
| USACE NE Bath Iron Works Maintenance Dredging and Brake Wheel Project | GARFO-2012-00030 / NER-2012-3995 | GARFO-2012-00030 | 11/07/2012 | Archived | |
| New York and New Jersey Harbor Deepening Project | GARFO-2012-00021 / NER-2012-02358 | GARFO-2012-00021 | 10/25/2012 | Archived | |
| Chesapeake Bay Entrance Channels Batch | GARFO-2012-00010 / NER-2012-01587 | GARFO-2012-00010 | 10/16/2012 | Archived | |
| James River Federal Navigation Channel Dredging | GARFO-2012-00013 / NER-2012-1183 | GARFO-2012-00013 | 9/24/2012 | Archived | |
| Reinitiation - ACOE NAO Sandbridge Shoal Dredge and Beach Nourishment | GARFO-2012-00014 / NER-2012-01586 | GARFO-2012-00014 | 9/7/2012 | Archived | |
| ACOE NAP - Delaware River Main Channel Deepening Reinitiation | GARFO-2011-00010 / NER-2011-754 | GARFO-2011-00010 | 7/11/2012 | Archived | |
| USACE NAE Permitting CMP's Bond Brook Coal Tar Remediation Project | GARFO-2011-00013 / NER-2010-6537 | GARFO-2011-00013 | 10/17/2011 | Archived | |
| ACOE NAE Maintenance Dredging Kennebec River Main Channel | GARFO-2011-00012 / NER-2011-691 | GARFO-2011-00012 | 6/29/2011 | Archived | |
| ACOE NAE Permitting Construction of a Combined Sewer Overflow Abatement Project around Bond Brook in Augusta, Maine by the Greater Augusta Utility District | GARFO-2010-00012 / NER-2010-6494 | GARFO-2010-00012 | 2/22/2011 | Archived | |
| ACOE NAE Bath Iron Works 10 Year Maintenance Dredge Permit | NER-2009-4518 | 11/4/2009 | Archived | ||
| ACOE NAE 2007 - 1808 Cianbro Constructors Module Fabrication Facility | GARFO-2007-00001 / NER-2007-5867 | GARFO-2007-00001 | 10/23/2007 | Archived | |
| ACE NAE Sconset Beach Nourishment Project, Nantucket, MA | GARFO-2007-00007 / NER-2006-3910 | GARFO-2007-00007 | 10/5/2007 | Archived | |
| ACE NAE Winthrop Shores Reservation Restoration Program | GARFO-2007-00006 / NER-2007-740 | GARFO-2007-00006 | 7/20/2007 | Archived | |
| ACE NY American Sugar Refining Co. Soft Dike | NER-2004-2234 | 12/7/2004 | Archived | ||
| ACE NY Ferry's Landing Coal Tar Remediation | NER-2004-473 | 7/12/2004 | Archived | ||
| Morrisville Flood Protection Levee | NER-2003-1177 | 4/19/2004 | Archived | ||
| Winthrop Shores Biological Sampling and Monitoring | NER-2003-1216 | 3/22/2004 | Archived | ||
| Kennebec River Emergency Dredging - Doubling Point | NER-2003-1461 | 1/13/2004 | Archived | ||
| New York and New Jersey Harbor Navigation Project | NER-2000-596 | 10/13/2000 | Archived | ||
| BOEM | Construction, Operation, Maintenance, and Decommissioning of the Revolution Wind Offshore Energy Project (Lease OCS-A 0486) | GARFO-2022-03532 | 10.25923/cc4z-hx25 | 7/21/2023 | Archived |
| New York Bight Fish, Fisheries, and Sand Features: In the Field Research Project | GARFO-2022-03016 | 10.25923/2n0a-3346 | 5/15/2023 | Archived | |
| Construction, Operation, Maintenance, and Decommissioning of the Vineyard Wind Offshore Energy Project (Lease OCS-A 0501) | GARFO-2021-01265 | 10.25923/h9hz-3c72 | 10/18/2021 | Archived | |
| Construction, Operation, and Decommissioning of the Vineyard Wind 1 project | GARFO-2019-00343 | 10.25923/c21h-te37 | 9/11/2020 | Archived | |
| BOEM: Virginia Offshore Wind Technology Advancement Project | GARFO-2014-00019 / NER-2015-12128 | 10.25923/ad9b-w596 | 7/9/2015 | Archived | |
| BOEM Lease and Site Assessment RI, MA, NY and NJ Wind Energy Areas | GARFO-2012-00011 / NER-2012-9211 | GARFO-2012-00011 | 4/10/2013 | Archived | |
| BOEM - Cape Wind Energy Project Reinitiation | GARFO-2010-00008 / NER-2010-3866 | GARFO-2010-00008 | 12/30/2010 | Archived | |
| MMS Lease to Cape Wind for wind energy project Nantucket Sound Mass | NER-2008-3508 | 11/13/2008 | Archived | ||
| EPA | 2019 National Rivers and Streams Assessment: ME, MA, RI, CT, NY, and NJ | GARFO-2019-00129 | 10.25923/xw4t-g735 | 7/30/2019 | Archived |
| Reinitiation of EPA: Re-initiation of Kennebec River Fish Assemblage Assessment | NER-2014-11398 | 1/12/2015 | Archived | ||
| EPA New England Fish Assemblage Assessments 2014 | GARFO-2014-00020 / NER-2014-11126 | GARFO-2014-00020 | 9/3/2014 | Archived | |
| EPA: Reinitiation of Kennebec River Fish Assemblage Assessment | NER-2013-10022 | 8/16/2013 | Archived | ||
| EPA: Kennebec River Fish Assemblage Assessment | NER-2012-2509 | 9/19/2012 | Archived | ||
| EPA Continued Operations of the Washington Aqueduct - Reinitiation | NER-2010-3876 | 11/29/2010 | Archived | ||
| EPA Bioassessment Via Kennebec River Maine | NER-2009-4801 | 9/21/2009 | Archived | ||
| EPA R1 New England Fish Assemblage Assessment | NER-2009-1913 | 7/30/2009 | Archived | ||
| EPA NPDES DC 0000019 Washington Aqueduct | NER-2008-3493 | 10/10/2008 | Archived | ||
| Ambient Water Quality Criteria for the Chesapeake Bay and its Tidal Tributaries | NER-2003-961 | 4/19/2004 | Archived | ||
| FERC | Continued operation of FERC No. 2004 Holyoke Hydroelectric Project Amended License | GARFO-2017-01088 / NER-2017-14221 | 10.25923/zd1h-eq11 | 7/24/2017 | Archived |
| Reinitiation of FERC No. 2004 Holyoke Hydroelectric Project Amended License | NER-2014-11654 | 2/12/2015 | Archived | ||
| FERC Amend Licenses for the Lockwood, Shawmut, Weston, Brunswick, and Lewiston Falls Projects (Interim Species Protection Plans) | GARFO-2013-00018 / NER-2013-9613 | GARFO-2013-00018 | 7/19/2013 | Archived | |
| FERC Amend License for Mattaceunk Project (Interim Species Protection Plan) | GARFO-2013-00024 / NER-2013-9640 | GARFO-2013-00024 | 6/20/2013 | Archived | |
| Miller Hydro Worumbo SPP and Emergency Repair | GARFO-2012-00026 / NER-2012-2537 | GARFO-2012-00026 | 10/18/2012 | Archived | |
| FERC 12611 Verdant Trawl Surveys in East River | GARFO-2012-00027 / NER-2012-2251 | GARFO-2012-00027 | 9/26/2012 | Archived | |
| Topsham Hydro Species Protection Plan-Pejepscot Project | GARFO-2012-00024 / NER-2012-1859 | GARFO-2012-00024 | 9/19/2012 | Archived | |
| Hydro-Kennebec Species Protection Plan | GARFO-2012-00023 / NER-2012-1860 | GARFO-2012-00023 | 9/17/2012 | Archived | |
| FERC - CP04-411-000; Crown Landing; LNG Terminal | GARFO-2005-00001 / NER-2015-5292 | GARFO-2005-00001 | 5/23/2006 | Archived | |
| FERC No. 2004 Holyoke Hydroelectric Project Amended License | NER-2003-1660 | 1/27/2005 | Archived | ||
| FERC No. 2574 Lockwood Hydroelectric Project | NER-2003-1675 | 1/12/2005 | Archived | ||
| FHWA | Nice-Middleton Bridge Replacement | GARFO-2023-01066 | 10.25923/0tmm-eg55 | 10/27/2023 | Archived |
| Grist Mill Bridge Replacement | GARFO-2018-00298 / NER-2018-14994 | 10.25923/vrxx-3h43 | 11/23/2018 | Archived | |
| Tappan Zee Bridge Replacement | GARFO-2017-01421 / NER-2017-14375 | 10.25923/vr51-j342 | 11/1/2017 | Archived | |
| Reinitiation of Tappan Zee | GARFO-2016-00729 / NER-2016-13822 | 10.25923/tdgc-t615 | 1/4/2017 | Archived | |
| Reinitiation of FHWA Tappan Zee Bridge Replacement (5th BiOp of Bridge Replacement) | NER-2014-11317 | 9/23/2014 | Archived | ||
| Reinitiation of 2nd Reinitiation of Tappan Zee Bridge Replacement | NER-2014-10768 | 4/2/2014 | Archived | ||
| Reinitiation of FHWA Tappan Zee Bridge Replacement | NER-2013-9592 | 4/10/2013 | Archived | ||
| FHWA/MEDOT: Richmond-Dresden Bridge Replacement | NER-2012-2137 | 11/26/2012 | Archived | ||
| FHWA Tappan Zee Bridge Replacement | NER-2012-1780 | 6/22/2012 | Archived | ||
| Tappan Zee Pile Installation Demonstration Project | NER-2011-5769 | 3/7/2012 | Archived | ||
| FHWA I-95 Scudders Falls Bridge Improvement Project | GARFO-2009-00003 / NER-2009-614 | GARFO-2009-00003 | 6/11/2010 | Archived | |
| FHWA Maine Brewer Dam Removal Project | NER-2008-1466 | 7/14/2008 | Archived | ||
| MARAD | Reinitiation of consultation on MARAD's issuance of a license to Northeast Gateway Energy Bridge, LLC to construct, own, and operate an LNG deepwater port | NER-2007-7653 | 11/30/2007 | Archived | |
| Neptune LNG | NER-2006-4000 | 1/12/2007 | Archived | ||
| Navy | Shoreline Protection System at the Naval Air Station Oceana, Dam Neck Annex | NER-2012-2021 | 7/20/2012 | Archived | |
| Shoreline Restoration and Protection Project at the Joint Expeditionary Base Little Creek - Fort Story | NER-2012-2020 | 7/13/2012 | Archived | ||
| Reinitiation on Dredging and Beach Nourishment along the Fleet Combat Training Center, Dam Neck, VA | NER-2003-1143 | 12/11/2003 | Archived | ||
| NASA | NASA Wallops Flight Facility SRIPP | NER-2010-534 | 7/22/2010 | Archived | |
| NASA Wallops Island Beach Nourishment/Stabilization | NER-2007-3720 | 9/25/2007 | Archived | ||
| NRC | NRC Relicensing of Salem and Hope Creek Nuclear Generating Stations | GARFO-2010-00010 / NER-2010-6581 | GARFO-2010-00010 | 7/17/2014 | Archived |
| NRC Continued Operations of Oyster Creek Nuclear Generating Station, NJ - Reinitiation | GARFO-2010-00011 / NER-2010-1855 | GARFO-2010-00011 | 11/21/2011 | Archived | |
| Indian Point | NER-2009-619 | 10/14/2011 | Archived | ||
| NRC Oyster Creek Nuclear Generating Station License Renewal 2009-2029 | NER-2006-5114 | 11/22/2006 | Archived | ||
| U.S. FWS | U.S. FWS Wildlife and Sport Fish Restoration Program grants 2018-2022 | GARFO-2017-00041 / NER-2018-14763 | 10.25923/jq5h-6h76 | 10/5/2018 | Archived |
| USFWS Region 5 Funding of Alewife Study in St. Croix River | GARFO-2014-00023 / NER-2014-11886 | 10.25923/dmm0-sk88 | 3/13/2015 | Archived | |
| Sport Fish Restoration Funding to Eleven States and the District of Columbia | GARFO-2012-00019 / NER-2012-3996 | GARFO-2012-00019 | 1/23/2013 | Archived | |
| USFWS Funding to CT DEEP for Marine Surveys | GARFO- 2012-00020 / NER-2012-1175 | GARFO-2012-00020 | 6/4/2012 | Archived | |
| USFWS Funding to State of New Jersey for Four Marine Surveys through the Dingell-Johnson Fish Restoration Grant | GARFO-2012-00022 / NER-2012-1151 | GARFO-2012-00022 | 5/11/2012 | Archived | |
| USGS | USGS Maine Coop, Brook Trout Research Cove, Brook, ME | GARFO-2007-00005 / NER-2007-7645 | GARFO-2007-00005 | 3/17/2008 | Archived |